FIR07-00821
| INSP-Sprinkler Rough-in | 10/4/2007 | 10/5/2007 | 10/5/2007 10:29:13 PM | A | FAIL |
|
|
The hood suppression system is not interconnected to the fire alarm panel (FACP is not functional at this time), wiring to the microswitch is not approved as installed, need to provide signage at the water supply isolation valve, no trip test completed at this time due to jobstie conditions, permit cannot be finaled or cooking equipment allowed to be used at this time.
|
FIR07-00321
| FIR-Aging Inspection | 10/5/2007 | 10/5/2007 | 10/5/2007 3:10:32 PM | | DEFR |
|
|
wip
|
FIR07-00787
| INSP-Final Inspection | 10/5/2007 | 10/5/2007 | 10/5/2007 3:10:11 PM | P | PASS |
|
|
Fire sprinkler work passed field inspection, permit finaled.
|
BLD07-02395
| FIRE-Final Inspection | 10/5/2007 | 10/5/2007 | 10/5/2007 2:42:17 PM | P | PASS |
|
|
Fire life safety passed.
|
FIR07-00796
| INSP-Sprinkler Rough-in/Hydro | 10/5/2007 | 10/5/2007 | 10/5/2007 2:40:34 PM | P | PART |
|
|
OH install is acceptable as noted, need flexible coupling at the riser masonry wall, also need to call in project related permit for inspection, hydrostatic test completed although not necessary as project is less than 20 heads total.
|
FIR07-00425
| INSP-Sprinkler Rough-in/Hydro | 10/4/2007 | 10/5/2007 | 10/5/2007 2:12:26 PM | A | FAIL |
|
|
OH hydrostatic test for the 3rd floor failed due to pressure loss at the guage.
|
FIR07-00425
| INSP-Sprinkler Rough-in/Hydro | 10/5/2007 | 10/5/2007 | 10/5/2007 2:11:32 PM | P | DEFR |
|
|
Duplicate inspection request.
|
BLD07-01051
| FIRE-Final Inspection | 10/4/2007 | 10/5/2007 | 10/5/2007 2:10:54 PM | A | PASS |
|
|
Fire life safety is satisfactory, noted the manual thumbturn at the main entry/exit shall be removed prior to structural final inspection.
|
FIR07-00754
| INSP-Final Inspection | 10/3/2007 | 10/5/2007 | 10/5/2007 1:03:16 PM | A | PASS |
|
|
Fire alarm work passed inspection, as-built plans accepted.
|
FIR07-00755
| INSP-Sprinkler Rough-in/Hydro | 10/4/2007 | 10/5/2007 | 10/5/2007 10:48:55 AM | A | PART |
|
|
Pneumatic testing for the preaction system passed.
|