BLD07-01836
| BLD-Conference | 10/2/2009 | 10/5/2009 | 10/7/2009 4:03:13 PM | A | PEND |
|
|
check on status
|
BLD09-01714
| BLD-Framing/Rough-in | 10/5/2009 | 10/5/2009 | 10/5/2009 5:13:25 PM | P | NR |
|
|
need trades
|
BLD09-00230
| BLD-Final | 10/1/2009 | 10/5/2009 | 10/5/2009 5:12:33 PM | P | FAIL |
|
|
Joe-After 3:30 please Phone #: ###-#### c/n posted,, need 3 temp windows
|
BLD09-01709
| BLD-Final | 10/2/2009 | 10/5/2009 | 10/5/2009 4:57:34 PM | P | PASS |
|
|
JEFF PLEASE CALL BEFORE GOING OUT Phone #: ###-####
|
BLD09-01709
| DOC - Permit Finaled | 10/5/2009 | 10/5/2009 | 10/5/2009 4:57:20 PM | P | PASS |
|
|
signed paperwork
|
BLD09-01284
| BLD-Final | 10/5/2009 | 10/5/2009 | 10/5/2009 4:35:37 PM | P | FAIL |
|
|
james - please call 1/2 hr prior Phone #: ###-#### need temp glass by pool stairs
|
BLD08-01972
| BLD-Final | 10/2/2009 | 10/5/2009 | 10/5/2009 3:31:23 PM | A | PART |
|
|
Patrick Phone #: ###-####
|
BLD08-01972
| BLD-Final | 10/5/2009 | 10/5/2009 | 10/5/2009 2:43:49 PM | P | PART |
|
|
Jerry; Phone #: ###-#### recieved letter from engineer,, need zoning still,, temp guard rails and handrails on rebuilt steps on exterior,, TEMP occ. still ok
|
BLD09-00819
| BLD-Final | 10/5/2009 | 10/5/2009 | 10/5/2009 2:24:15 PM | P | NR |
|
|
Ron Phone #: ###-#### need mech 1st,, on site conf.. ok pending mech final
|
BLD09-01416
| BLD-Framing/Rough-in | 10/5/2009 | 10/5/2009 | 10/5/2009 2:00:47 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/5/2009 at 8:39:49 AM. Contact: ###-####.
|
MIS09-00181
| Set Bond Amount | 10/2/2009 | 10/5/2009 | 10/5/2009 12:16:25 PM | A | PASS |
|
|
Dale Phone #: ###-#### need $1000.00 bond
|
BLD09-01269
| BLD-Energy code compliance | 10/2/2009 | 10/5/2009 | 10/5/2009 12:10:42 PM | A | PASS |
|
|
Jon Phone #: ###-####
|
BLD09-01714
| BLD-Framing/Rough-in | 10/2/2009 | 10/5/2009 | 10/5/2009 11:19:54 AM | A | NR |
|
|
Kevin Phone #: ###-#### need elec
|