FIR09-00584
| INSP-Alarm Testing | 10/2/2009 | 10/5/2009 | 10/5/2009 3:14:53 PM | P | FAIL |
|
|
Testing will need to be redone due to the monitoring account not being set up.
|
BLD09-01367
| FIRE-Final Inspection | 10/2/2009 | 10/5/2009 | 10/5/2009 3:09:57 PM | A | FAIL |
|
|
This inspection was an ok for partial use of the east side dressing rooms.
|
FIR09-00581
| INSP-Sprinkler Rough-in | 10/5/2009 | 10/5/2009 | 10/5/2009 2:47:27 PM | P | PASS |
|
|
The underground supply piping is ok to cover.
|
FIR09-00490
| INSP-Final Inspection | 10/5/2009 | 10/5/2009 | 10/5/2009 2:46:25 PM | P | PASS |
|
|
Permit finaled. Upright protection has been provided in the combustible concealed space as requested.
|
BLD07-02085
| FIRE-Final Inspection | 10/1/2009 | 10/5/2009 | 10/5/2009 2:45:30 PM | P | FAIL |
|
|
The project related fire sprinkler and fire alarm permits need to be finaled, both of the horizontal sliding doors need to be adjusted so that they easily open manually, the atrium smoke evacuation system needs to be addressed, the exit discharge lighting needs to be removed from control by the photocells and electrical super vision of the horizontal sliding doors needs to be addressed. All of the exit signs, emergency lights and exit discharge lights need to be inspected for placement and tested for functionality after the generator switch over has been repaired. Also need to verify that the relocation of the emergency generator is ok with plan review.
|
BLD07-02082
| FIRE-Final Inspection | 10/1/2009 | 10/5/2009 | 10/5/2009 2:45:05 PM | P | FAIL |
|
|
The project related fire sprinkler and fire alarm permits need to be finaled, both of the horizontal sliding doors need to be adjusted so that they easily open manually, the atrium smoke evacuation system needs to be addressed, the exit discharge lighting needs to be removed from control by the photocells and electrical super vision of the horizontal sliding doors needs to be addressed. All of the exit signs, emergency lights and exit discharge lights need to be inspected for placement and tested for functionality after the generator switch over has been repaired. Also need to verify that the relocation of the emergency generator is ok with plan review.
|
BLD07-02083
| FIRE-Final Inspection | 10/1/2009 | 10/5/2009 | 10/5/2009 2:44:44 PM | P | FAIL |
|
|
The project related fire sprinkler and fire alarm permits need to be finaled, both of the horizontal sliding doors need to be adjusted so that they easily open manually, the atrium smoke evacuation system needs to be addressed, the exit discharge lighting needs to be removed from control by the photocells and electrical super vision of the horizontal sliding doors needs to be addressed. All of the exit signs, emergency lights and exit discharge lights need to be inspected for placement and tested for functionality after the generator switch over has been repaired. Also need to verify that the relocation of the emergency generator is ok with plan review.
|
FIR08-00830
| INSP-Final Inspection | 10/2/2009 | 10/5/2009 | 10/5/2009 2:38:59 PM | A | FAIL |
|
|
The issue with the atrium sprinkler protection is waiting to be resolved. The backflow preventor that is installed is not what was submitted on and signage needs to be provided for the control valves. Per Lonnie the outside alarm bell will be changed out and the signage provided on it as well.
|
FIR09-00482
| INSP-Sprinkler Rough-in | 10/2/2009 | 10/5/2009 | 10/5/2009 9:13:53 AM | A | PASS |
|
|
The new PIV piping can be covered.
|
BLD09-01304
| FIRE-Final Inspection | 10/2/2009 | 10/5/2009 | 10/5/2009 6:06:27 AM | A | PASS |
|
|
Life safety passed.
|
BLD09-01303
| FIRE-Final Inspection | 10/2/2009 | 10/5/2009 | 10/5/2009 6:05:37 AM | A | PASS |
|
|
life safety passed.
|
FIR09-00545
| INSP-Final Inspection | 10/2/2009 | 10/5/2009 | 10/5/2009 5:57:09 AM | A | PASS |
|
|
Permit finaled
|