Inspections for the day of: Monday, October 5, 2009.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00952 Aging Inspection10/5/200910/5/200910/7/2009 1:46:16 PM DONE
ESC09-00617 Site Preparation10/2/200910/5/200910/6/2009 12:38:09 PMAPASS
ESC09-00575 Site Preparation10/5/200910/5/200910/5/2009 3:03:13 PM PASS
ESC09-00598 Site Preparation ESC10/5/200910/5/200910/5/2009 2:11:55 PM CANC
All work is complete.
ESC09-00577 General Inspection10/2/200910/5/200910/5/2009 2:06:45 PMAPASS
ESC09-00594 Site Preparation ESC10/5/200910/5/200910/5/2009 2:06:13 PM PART
Verbal to RP:
Clean up all sediment and debris off of all hardsurface by the end of the day each day.
ESC09-00086 Tracking Control10/5/200910/5/200910/5/2009 10:40:37 AMAFAIL
Correction Notice:
Clean up all hard surfaces of all sediment and debris. Failure to comply will result in a STOP WORK ORDER. Will re-inspect on 10/06/09 AM.
ESC08-00952 Tracking Control10/5/200910/5/200910/5/2009 10:40:24 AMAFAIL
Correction Notice:
Clean up all hard surfaces of all sediment and debris. Failure to comply will result in a STOP WORK ORDER. Will re-inspect on 10/06/09 AM.
ESC08-00657 BMP Violation10/5/200910/5/200910/5/2009 10:23:12 AMAFAIL
Verbal to RP:
Remove or install a sediment barrier along the perimeter where stockpile are located.
Also clean up all sediemnt and debris off of all hard surfaces. Will re-inspect on 10/06/09AM.
ESC09-00104 Tracking Control10/5/200910/5/200910/5/2009 9:54:09 AMAFAIL
Verbal to RP:
Clean up tracking off of both exits. Also clean all tires prior to leaving site to pervent tracking. Recommend parking all vechiles off of the dirt and onto the hard surfaces.
ESC09-00138 Site Preparation10/5/200910/5/200910/5/2009 9:52:12 AM PASS
ESC08-01050 Random Inspection10/5/200910/5/200910/5/2009 9:15:55 AMAPASS
Removed the exit at Warnsprings to the west of the project through the RiverStone school.
ESC09-00470 Tracking Control10/5/200910/5/200910/5/2009 9:14:48 AMAPART
Told Contractor to clean all tire off prior to leaving project area. Will be washing tires with a water truck prior to exiting the project.
ESC09-00507 General Inspection10/2/200910/5/200910/5/2009 9:13:37 AMAPASS
Site is holdong up well. All BMP's installed correctly and working well.