Inspections for the day of: Wednesday, October 5, 2011.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00250 INSP-Final Inspection9/28/201110/5/201110/5/2011 5:31:18 PMPPASS
Scope of work passed inspection. Permit finaled.
BLD11-02072 FIRE-Final Inspection10/5/201110/5/201110/5/2011 5:29:35 PMPNR
BLD11-02291 FIRE-Conference10/5/201110/5/201110/5/2011 5:28:54 PMPDONE
On site conference regarding remodel work and the existing fire sprinkler system coverage related.
FIR11-00186 INSP-Final Inspection10/5/201110/5/201110/5/2011 5:24:10 PMPPASS
Fire alarm permit finaled.
FIR11-00355 INSP-Sprinkler Rough-in10/4/201110/5/201110/5/2011 5:23:14 PMAFAIL
Hydrostatic test of the overhead system failed due to a 10 psi. pressure loss at the guage. Relocated heads at the 1st floor corridor and 2nd floor utility rooms okayed.
FIR11-00505 INSP-Final Inspection10/4/201110/5/201110/5/2011 12:40:10 PMAPASS
Fire sprinkler permit final approved. Scope of work is finished.
FIR11-00505 INSP-Sprinkler Rough-in10/5/201110/5/201110/5/2011 12:38:46 PMAPART
Overhead fire sprinkler modification approved for cover.
FIR11-00186 INSP-Alarm Testing10/4/201110/5/201110/5/2011 12:34:51 PMAPASS
After hours reinspection passed, functional testing completed. C/N items and plan modifications verified.
BLD11-00783 FIRE-Conference10/4/201110/5/201110/5/2011 12:29:58 PMADONE
On site conference regarding remodel schedule, related fire alarm and sprinkler trade permit work, life safety items.
FIR11-00414 INSP-Sprinkler Rough-in10/4/201110/5/201110/5/2011 12:27:33 PMAPART
UG fire supply line flush completed satisfactory.
BLD11-02236 FIRE-Final Inspection10/4/201110/5/201110/5/2011 8:46:49 AMAPASS