MIS12-00277
| MEC-Conference | 10/5/2012 | 10/5/2012 | 10/5/2012 4:46:20 PM | P | PEND |
|
|
A-1 plumbing installed a W/h without a permit. They are now required to obtain a permit and fix the c/n...the door into equipment room needs to self closing and the louvers covered up..all comb air to come from outside
|
MEC12-01115
| Mec-Aging Inspection | 10/5/2012 | 10/5/2012 | 10/5/2012 4:42:33 PM | | PASS |
|
|
WIP per g/c
|
MEC11-03236
| Final | 10/5/2012 | 10/5/2012 | 10/5/2012 4:42:08 PM | P | PASS |
|
|
gas only
|
MEC11-03236
| Pressure Test | 10/5/2012 | 10/5/2012 | 10/5/2012 4:41:20 PM | P | PASS |
|
|
20lb gas on existing gas line to furn ok
|
MEC12-03462
| Final | 10/5/2012 | 10/5/2012 | 10/5/2012 4:05:21 PM | P | PASS |
|
|
As late as possible please. Roger, ###-#### Phone #: ###-#### >> Inspection requested via web by April Thomas
|
MEC12-02968
| Final | 10/4/2012 | 10/5/2012 | 10/5/2012 3:39:32 PM | P | PEND |
|
|
Contact Mark Hammer for questions. Final should be ready in after 12:00 pm. Phone #: ###-#### >> Inspection requested via web by Allison Briggs....;had to leave for an emergency...plus he needed to fix a couple issues so he will reschedule for mon pm
|
MEC12-03230
| Rough-in | 10/5/2012 | 10/5/2012 | 10/5/2012 3:35:22 PM | P | PASS |
|
|
Gary Phone #: ###-####
|
MEC12-03100
| Rough-in | 10/4/2012 | 10/5/2012 | 10/5/2012 2:57:53 PM | A | PASS |
|
|
###-#### doug
|
MEC12-02775
| Pressure Test | 10/4/2012 | 10/5/2012 | 10/5/2012 2:34:49 PM | A | PASS |
|
|
As late in the morning as possible. Thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas...60lb gas ok
|
MEC12-02775
| Rough-in | 10/4/2012 | 10/5/2012 | 10/5/2012 2:34:06 PM | A | PASS |
|
|
As late in the morning as possible. Thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas
|
GCM12-00156
| GCM-Final | 10/5/2012 | 10/5/2012 | 10/5/2012 1:40:32 PM | P | PASS |
|
|
1:30 meet homeowner
|
GCM12-00175
| GCM-Final | 10/5/2012 | 10/5/2012 | 10/5/2012 1:40:09 PM | P | PASS |
|
|
1:30 meet homeowner
|
GCM12-00186
| GCM-Final | 10/4/2012 | 10/5/2012 | 10/5/2012 11:24:44 AM | A | NR |
|
|
###-####...need a manual J...need to treat as a complete r/i inspection..will need to see all ductwork to match plan..access to see dryer vent ..access to dampers...duct blaster, air balance..and a GAS TEST
|
MEC12-02490
| Rough-in | 10/4/2012 | 10/5/2012 | 10/5/2012 11:15:01 AM | A | PART |
|
|
Rough in above ceiling. Contact Ben Livingston ###-#### Phone #: ###-#### >> Inspection requested via web by Dan Flaherty...ok to cover 2nd floor lids in all areas
|
MEC12-03318
| Conference | 10/4/2012 | 10/5/2012 | 10/5/2012 10:52:40 AM | A | NR |
|
|
any Question or problem Contact Arlen Dowdy @ ###-#### Phone #: ###-#### >> Inspection requested via web by Arlen Dowdy...need outside air
|
MEC12-02002
| Final | 10/4/2012 | 10/5/2012 | 10/5/2012 10:17:15 AM | A | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by Doug Anderson...they are pouring concrete...no access to house
|
MEC12-00480
| Final | 10/4/2012 | 10/5/2012 | 10/5/2012 9:50:20 AM | A | PASS |
|
|
Dixie, I did not get ahold of the home owner but here is the request anyway. Thanks - Diane Phone #: ###-#### >> Inspection requested via web by Lisa Whitney
|
MEC12-01109
| Mec-Aging Inspection | 10/5/2012 | 10/5/2012 | 10/5/2012 9:12:49 AM | | PASS |
|
|
wip per g/c
|