FIR11-00195
| FIR-Aging Inspection | 10/5/2012 | 10/5/2012 | 10/10/2012 9:31:51 AM | | NR |
|
|
See conference notes
|
FIR11-00296
| FIR-Aging Inspection | 10/5/2012 | 10/5/2012 | 10/8/2012 12:09:37 PM | | NR |
|
|
Mark is working on this permit. An email has been sent to Scoot by Mark requiesting furhter action.
|
FIR12-00314
| INSP-Sprinkler Rough-in/Hydro | 10/5/2012 | 10/5/2012 | 10/5/2012 4:07:38 PM | P | PASS |
|
|
24 horu test passed.
|
BLD12-00550
| FIRE-Final Inspection | 10/4/2012 | 10/5/2012 | 10/5/2012 3:55:34 PM | P | CANC |
|
|
Overbooked. I contacted Peter and we agreed to reschedule for monday morning. I can find no record of a sprinkler permit for the changes that were needed per the previous conference. Peter stated the original contractor was no longer there and he did not know about sprinkler requirements.
|
FIR12-00198
| INSP-Final Inspection | 10/5/2012 | 10/5/2012 | 10/5/2012 3:44:23 PM | P | PASS |
|
|
Permit finaled
|
BLD12-00388
| FIRE-Final Inspection | 10/5/2012 | 10/5/2012 | 10/5/2012 3:36:06 PM | P | PASS |
|
|
Life safety passed per inspector 410
|
FIR12-00487
| INSP-Sprinkler Rough-in/Hydro | 10/4/2012 | 10/5/2012 | 10/5/2012 3:20:29 PM | A | PASS |
|
|
The overhead hydro test passed inspection.
|
FIR12-00393
| INSP-Sprinkler Rough-in | 10/4/2012 | 10/5/2012 | 10/5/2012 3:15:47 PM | A | FAIL |
|
|
Provide "job site copy" city approved plans for inspection, three upright heads on two lines (six total heads) are blocked by truss webbing, branchline restraint is missing, earthquake bracing is missing, wrong extended coverage pendants have been installed which will require a plan modification, as-builts will atleast be needed to show the pipe routing changes, one upright head at the mezzanine walkway appears to be overspaced. Ceiling tile can be installed since items needing correction can be viewed from the mechanical walkway.
|
BLD11-02317
| FIRE-Final Inspection | 10/4/2012 | 10/5/2012 | 10/5/2012 1:37:56 PM | A | CANC |
|
|
I left voice message for Bruce stating that before I can perform a life safety inspection I would need the revised building plans. Per the online activities plans were resubmitted on 10/1/2012 and are still in the "review status" with a note from the plan reviewer stating that only the council chambers are approved. No inspection was performed.
|
FIR12-00343
| INSP-Final Inspection | 10/4/2012 | 10/5/2012 | 10/5/2012 12:42:01 PM | A | PASS |
|
|
Permit finaled.
|
FIR12-00456
| INSP-Final Inspection | 10/4/2012 | 10/5/2012 | 10/5/2012 11:52:32 AM | A | PASS |
|
|
Permit finaled. Netcon was a 5
|
FIR12-00091
| INSP-Final Inspection | 9/25/2012 | 10/5/2012 | 10/5/2012 11:50:49 AM | A | PASS |
|
|
permit finaled
|
FIR12-00087
| INSP-Final Inspection | 9/25/2012 | 10/5/2012 | 10/5/2012 11:00:03 AM | A | FAIL |
|
|
Monitoring station did not receive any of our test signals. Steve is going to inverstigate.
|
BLD12-02648
| FIRE-Final Inspection | 10/4/2012 | 10/5/2012 | 10/5/2012 10:53:10 AM | A | FAIL |
|
|
Remove the thumbturn deadbolt and provide keyed hardware with the sticker as discussed, provide single action hardware on the west exit door and remove the deadbolt, provide resubmittals showing the attic/mezzanine storage access including the stairs/ladder. See the city approved plans for corrections marked in red.
|
BLD12-02647
| FIRE-Final Inspection | 10/4/2012 | 10/5/2012 | 10/5/2012 10:51:49 AM | A | FAIL |
|
|
Remove the thumbturn deadbolt and provide keyed hardware with the sticker as discussed, provide single action hardware on the west exit door and remove the deadbolt, provide resubmittals showing the attic/mezzanine storage access including the stairs/ladder. See the city approved plans for corrections marked in red.
|
FIR12-00198
| INSP-Final Inspection | 10/4/2012 | 10/5/2012 | 10/5/2012 10:00:12 AM | A | FAIL |
|
|
Provide map at the facp with a legend so the responding fire dept. can interpret the map, provide as-built floor plan that is to scale (as the original submittal), provide NFPA 72 record of completion forms.
|
FIR12-00089
| INSP-Final Inspection | 9/25/2012 | 10/5/2012 | 10/5/2012 8:07:10 AM | A | PASS |
|
|
permit finaled
|
BLD12-00865
| FIRE-Final Inspection | 10/4/2012 | 10/5/2012 | 10/5/2012 7:46:37 AM | A | PASS |
|
|
Life safety passed. Revise floor plan is on site.
|