Inspections for the day of: Monday, October 5, 2015.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00066 FIR-Aging Inspection10/5/201510/5/201510/13/2015 1:36:04 PM PASS
permit finaled
FIR15-00177 INSP-Final Inspection10/5/201510/5/201510/5/2015 3:00:35 PMPFAIL
Tried to retest the electric alarm bell and found the the backflow preventor appears to be "cycling" and not allowing the flow switch to activate.
FIR15-00640 INSP-Sprinkler Rough-in/Hydro10/2/201510/5/201510/5/2015 2:18:28 PMPCANC
Contact - Matt Robison - ###-#### Phone #: ###-#### Inspection requested via web by Stan Beus
FIR15-00655 INSP-Sprinkler Rough-in/Hydro10/2/201510/5/201510/5/2015 2:17:56 PMPCANC
Contact - Matt Robison - ###-####
Phone #: ###-#### Inspection requested via web by Stan Beus
FIR15-00303 INSP-Sprinkler Rough-in/Hydro10/5/201510/5/201510/5/2015 2:17:28 PMPPASS
Overhead hydro test passed.
BLD15-01632 FIRE-Final Inspection10/2/201510/5/201510/5/2015 2:17:05 PMAFAIL
Need insulation attached in more locations in Mech Room 125, exit signs and emergency lights still did not get repaired and there is still the possible issue with the vanilla finish permit
FIR15-00640 INSP-Supply line flush10/2/201510/5/201510/5/2015 11:27:49 AMAPASS
Underground flush passed
FIR15-00655 INSP-Supply line flush10/2/201510/5/201510/5/2015 11:27:23 AMAPASS
underground flush passed
FIR15-00656 INSP-Supply line flush10/2/201510/5/201510/5/2015 11:25:25 AMAPASS
Underground flush passed
FIR15-00215 INSP-Final Inspection10/2/201510/5/201510/5/2015 11:17:46 AMPPASS
Permit finaled
FIR15-00286 INSP-Final Inspection10/2/201510/5/201510/5/2015 11:05:58 AMPPASS
permit finaled
FIR15-00216 INSP-Final Inspection10/2/201510/5/201510/5/2015 10:58:24 AMPPASS
permit finaled
FIR15-00287 INSP-Final Inspection10/2/201510/5/201510/5/2015 10:55:56 AMPPASS
Permit finaled
BLD14-03492 FIRE-Final Inspection10/2/201510/5/201510/5/2015 9:34:20 AMAFAIL
Need shell core finaled, need hardware between office and warehouse either reversed or changed to passage
BLD14-03491 FIRE-Final Inspection10/2/201510/5/201510/5/2015 9:33:48 AMAFAIL
Need shell core finaled, need hardware between office and warehouse either reversed or changed to passage
BLD14-03490 FIRE-Final Inspection10/2/201510/5/201510/5/2015 9:33:09 AMAFAIL
Need shell core finaled, need hardware between office and warehouse either reversed or changed to passage, need exit discharge light at north end of building repaired.
BLD14-03468 FIRE-Final Inspection10/2/201510/5/201510/5/2015 9:31:44 AMAFAIL
Need all small documents, need new location of the fire hydrant approved, need exit discharge light on north end of building repaired. Need the project related fire alarm and fire sprinkler permits finaled.
FIR15-00177 INSP-Final Inspection10/1/201510/5/201510/5/2015 9:28:07 AMPFAIL
Need test papers and tags for riser, bell did not work. Forward flush passed.
FIR15-00250 INSP-Final Inspection10/4/201510/5/201510/5/2015 9:26:01 AMAFAIL
Need correct responding address, need as-builts submitted to Lee, outside electric bell did not function, phone lines for fire alarm control panel need to be installed correctly, need map at the fire alarm control panel. All other items tested ok.
FIR15-00656 INSP-Sprinkler Rough-in/Hydro10/2/201510/5/201510/5/2015 9:23:00 AMPPASS
Rough-in passed. Piping can not be covered until a tenting inspection has passed.
FIR15-00657 INSP-Sprinkler Rough-in/Hydro10/2/201510/5/201510/2/2015 2:35:23 PMPCANC
Contact is Matt Robison- ###-#### - Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
FIR15-00657 INSP-Supply line flush10/2/201510/5/201510/2/2015 2:35:20 PMACANC
Contact is Matt Robison- ###-#### - Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus