Inspections for the day of: Thursday, October 5, 2017.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-02225 ELE-Aging Inspection10/5/201710/5/201710/6/2017 6:40:49 AM FAIL
still waiting on contractor to schedule inspections...non accessible
ELE17-02735 Final10/5/201710/5/201710/5/2017 2:37:46 PMPFAIL
Phone #: ###-#### Inspection requested via web by Stephanie Huston...
1) master bath outlets are double GFI protected,; only one GFI shall be used to protect outlets
2) bath light over tub shall be installed and abide by codes of NEC...410.10(A), 410.10(B), 110.3(A)
ELE17-00728 Electrical Rough-In10/5/201710/5/201710/5/2017 1:57:42 PMPPASS
Ceiling Cover. Von is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen...outside entry soffit cans...ok to cover
ELE17-02659 Final10/5/201710/5/201710/5/2017 12:51:05 PMPCANC
Phone #: ###-#### Inspection requested via web by Christy Cheney...as per contractor scheduled wrong day
ELE17-03356 Final10/5/201710/5/201710/5/2017 12:44:02 PMPPASS
please contact jon at ###-#### prior to going to site. Phone #: ###-#### Inspection requested via web by Matt Phillips..new wires to computer station in Clicklist...job complete ok to final
ELE17-03356 Electrical Rough-In10/5/201710/5/201710/5/2017 12:43:39 PMPPASS
please contact jon at ###-#### prior to going to site. Phone #: ###-#### Inspection requested via web by Matt Phillips...LV wires ran, strapped off grid, conduit with protective bushings..ok
ELE17-03359 Permanent Service10/4/201710/5/201710/5/2017 12:10:32 PMAPASS
Please call before heading out. Phone #: ###-#### Inspection requested via web by Jose Guerrero...p/s u/g rec ok
ELE17-03364 Final10/5/201710/5/201710/5/2017 10:44:16 AMAPASS
ok to final...verified switching and operation
ELE17-03364 Electrical Rough-In10/5/201710/5/201710/5/2017 10:41:37 AMAPASS
rough in for LED highbays at school gym Phone #: ###-#### Inspection requested via web by Tim Dunlop...UL listed fixture replacement with quick disconnect
ELE17-03014 Final10/5/201710/5/201710/5/2017 9:53:31 AMAPASS
Phone #: ###-#### Inspection requested via web by mark hood...ok to final
ELE17-03309 Electrical Rough-In10/5/201710/5/201710/5/2017 9:38:02 AMPPASS
Jose Phone #: ###-####...ok to cover walls
ELE17-03357 Electrical Rough-In10/4/201710/5/201710/5/2017 9:29:02 AMAPASS
Burial inspection for pvc conduit in the ground from the panel to the back yard. Thank you! Phone #: ###-#### Inspection requested via web by Adam Staigle...ok to barry pipe
ELE17-02996 Rough-In Permanent Service10/5/201710/5/201710/5/2017 9:20:21 AMAPASS
Phone #: ###-#### Inspection requested via web by Robert Murray....rough ok to cover...p/s u/g new ok
ELE17-03300 Rough-In Permanent Service10/4/201710/5/201710/5/2017 8:47:17 AMAPASS
Phone #: ###-#### Inspection requested via web by Bob Glenn...rough ok to cover...p/s u/g new ok
ELE17-03313 Permanent Service10/4/201710/5/201710/4/2017 3:00:20 PMACANC
Joe Phone #: ###-####...wrong inspection..finaled 10/4/17
ELE17-03353 Electrical Rough-In10/4/201710/5/201710/4/2017 2:50:32 PMAPASS
Job complete. Final needed. Phone #: ###-#### Inspection requested via web by Stuart Welton..

ok to final...new fused disconnect
ELE17-02453 Permanent Service10/4/201710/5/201710/4/2017 1:23:41 PMAPASS
Phone #: ###-#### Inspection requested via web by Zane Robertson...p/s u/g new ok...location of meter is in PNL F location in meter pack