BLD18-01191
| BLD-Framing/Rough-in | 9/28/2018 | 9/28/2018 | | P | |
|
|
Requesting an interior framing inspection. Phone #: ###-#### >> Inspection requested via web by Markus Schlegel
|
GRD18-00037
| GRD-Final | 10/4/2018 | 10/5/2018 | 10/5/2018 4:51:47 PM | A | NR |
|
|
Mike Phone #: ###-####. Need 3rd party inspection final letter.
|
BLD18-01191
| BLD-Other | 10/4/2018 | 10/5/2018 | 10/5/2018 4:51:19 PM | P | DEFR |
|
|
Requesting a fire proofing inspection of 5 columns of grid line C. Phone #: ###-#### Inspection requested via web by Markus Schlegel. OK per 3rd party.
|
BLD18-03118
| BLD-Final | 10/4/2018 | 10/5/2018 | 10/5/2018 1:50:16 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting
|
BLD18-03118
| DOC - Permit Finaled | 10/5/2018 | 10/5/2018 | 10/5/2018 1:50:06 PM | P | PASS |
|
|
|
BLD18-03531
| BLD-Final | 10/5/2018 | 10/5/2018 | 10/5/2018 1:24:37 PM | P | DONE |
|
|
All the work is complete ready for final inspection Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD18-03531
| DOC - Permit Finaled | 10/5/2018 | 10/5/2018 | 10/5/2018 1:24:26 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD18-01160
| BLD-Energy code compliance | 10/5/2018 | 10/5/2018 | 10/5/2018 1:17:46 PM | P | PASS |
|
|
Joseph Blumberg ###-####
|
BLD16-04492
| BLD-Final | 10/5/2018 | 10/5/2018 | 10/5/2018 1:16:25 PM | P | FAIL |
|
|
Any issues, please contact Dylon, assistant site supervisor, at ###-####. Phone #: ###-#### Inspection requested via web by Sam Brown. Tempered glazing required on window by stairs at mid landing.
|
BLD16-04492
| BLD-Blower Door Test Results | 10/5/2018 | 10/5/2018 | 10/5/2018 1:15:27 PM | P | DONE |
|
|
5.5ACH @50pa.
|
BLD18-03185
| BLD-Foundation | 10/4/2018 | 10/5/2018 | 10/5/2018 11:04:32 AM | A | PART |
|
|
after 11-Terry Phone #: ###-####. Also appears that footing issue has been reolved. In place footing measures 8 inches in thickness.
|
BLD18-01425
| BLD-Foundation | 10/3/2018 | 10/5/2018 | 10/5/2018 10:35:34 AM | A | PASS |
|
|
rebar // James Phone #: ###-####. Rmainder of area 2 and interior column pad footings in area 2. Prevoios exterior column pad footings on area 2 that were missing the top mat have been repaired. Exterior footings for area 3.
|
BLD18-02372
| BLD-Framing/Rough-in | 10/3/2018 | 10/5/2018 | 10/5/2018 9:57:28 AM | A | PASS |
|
|
Gary-framing in ceiling only-or ###-#### Calvin Phone #: ###-####. New framed openings in roof structure for new RTU's and curbs. All work done per the New engineering provided by performance engineers.
|
BLD18-01730
| BLD-Framing/Rough-in | 10/4/2018 | 10/5/2018 | 10/5/2018 9:27:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark Becker. Interior steel studframed walls ok. No grid at this time. Pending electrical rough in inspection.
|
BLD18-02293
| BLD-Final | 10/4/2018 | 10/5/2018 | 10/5/2018 8:36:45 AM | A | NR |
|
|
Call half hour before to meet // Will Phone #: ###-####. Needs to resolve fire issues.
|
BLD18-02116
| BLD-Energy code compliance | 10/4/2018 | 10/5/2018 | 10/5/2018 8:35:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Erik Wylie
|
BLD18-02116
| BLD-Framing/Rough-in | 10/5/2018 | 10/5/2018 | 10/5/2018 8:35:48 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Erik Wylie. All framing issues have bee resolved. Also reviewed Engineers letter regarding the portal frames, those issues hve been correctedas well. ok to cover.
|