Inspections for the day of: Friday, October 5, 2018.
Number of inspections: 17
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01191 BLD-Framing/Rough-in9/28/20189/28/2018 P 
Requesting an interior framing inspection. Phone #: ###-#### >> Inspection requested via web by Markus Schlegel
GRD18-00037 GRD-Final10/4/201810/5/201810/5/2018 4:51:47 PMANR
Mike Phone #: ###-####. Need 3rd party inspection final letter.
BLD18-01191 BLD-Other10/4/201810/5/201810/5/2018 4:51:19 PMPDEFR
Requesting a fire proofing inspection of 5 columns of grid line C. Phone #: ###-#### Inspection requested via web by Markus Schlegel. OK per 3rd party.
BLD18-03118 BLD-Final10/4/201810/5/201810/5/2018 1:50:16 PMPDONE
Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD18-03118 DOC - Permit Finaled10/5/201810/5/201810/5/2018 1:50:06 PMPPASS
BLD18-03531 BLD-Final10/5/201810/5/201810/5/2018 1:24:37 PMPDONE
All the work is complete ready for final inspection Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD18-03531 DOC - Permit Finaled10/5/201810/5/201810/5/2018 1:24:26 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD18-01160 BLD-Energy code compliance10/5/201810/5/201810/5/2018 1:17:46 PMPPASS
Joseph Blumberg ###-####
BLD16-04492 BLD-Final10/5/201810/5/201810/5/2018 1:16:25 PMPFAIL
Any issues, please contact Dylon, assistant site supervisor, at ###-####. Phone #: ###-#### Inspection requested via web by Sam Brown. Tempered glazing required on window by stairs at mid landing.
BLD16-04492 BLD-Blower Door Test Results10/5/201810/5/201810/5/2018 1:15:27 PMPDONE
5.5ACH @50pa.
BLD18-03185 BLD-Foundation10/4/201810/5/201810/5/2018 11:04:32 AMAPART
after 11-Terry Phone #: ###-####. Also appears that footing issue has been reolved. In place footing measures 8 inches in thickness.
BLD18-01425 BLD-Foundation10/3/201810/5/201810/5/2018 10:35:34 AMAPASS
rebar // James Phone #: ###-####. Rmainder of area 2 and interior column pad footings in area 2. Prevoios exterior column pad footings on area 2 that were missing the top mat have been repaired. Exterior footings for area 3.
BLD18-02372 BLD-Framing/Rough-in10/3/201810/5/201810/5/2018 9:57:28 AMAPASS
Gary-framing in ceiling only-or ###-#### Calvin Phone #: ###-####. New framed openings in roof structure for new RTU's and curbs. All work done per the New engineering provided by performance engineers.
BLD18-01730 BLD-Framing/Rough-in10/4/201810/5/201810/5/2018 9:27:34 AMAPASS
Phone #: ###-#### Inspection requested via web by Mark Becker. Interior steel studframed walls ok. No grid at this time. Pending electrical rough in inspection.
BLD18-02293 BLD-Final10/4/201810/5/201810/5/2018 8:36:45 AMANR
Call half hour before to meet // Will Phone #: ###-####. Needs to resolve fire issues.
BLD18-02116 BLD-Energy code compliance10/4/201810/5/201810/5/2018 8:35:57 AMAPASS
Phone #: ###-#### Inspection requested via web by Erik Wylie
BLD18-02116 BLD-Framing/Rough-in10/5/201810/5/201810/5/2018 8:35:48 AMAPASS
Phone #: ###-#### Inspection requested via web by Erik Wylie. All framing issues have bee resolved. Also reviewed Engineers letter regarding the portal frames, those issues hve been correctedas well. ok to cover.