BLD96-03206
| INSP-Final Inspection | 10/2/1997 | 10/6/1997 | 10/6/1997 12:00:00 AM | A | PART |
|
|
architect requested insp for 8:15 - 409 pre-final inspection. reviewed alarm testing, elevator, generator and standpipe requirements.
|
BLD97-00447
| INSP-Sprinkler Rough-in/Hydro | 10/3/1997 | 10/6/1997 | 10/6/1997 12:00:00 AM | A | PASS |
|
|
requests 10:00 am if possible (Roy pager ###-####) underground flush and rough-in okay.
|
BLD97-00598
| INSP-Final Inspection | 10/6/1997 | 10/6/1997 | 10/6/1997 12:00:00 AM | P | PASS |
|
|
main exit door edge mount bolts removed. c/o approved.
|
BLD97-02316
| INSP-Conference | 10/6/1997 | 10/6/1997 | 10/6/1997 12:00:00 AM | P | PART |
|
|
CONFERENCE ON EXIT LIGHT PLACEMENT AND FINAL INSPECTION REQUIREMENTS.
|