FIR05-00405
| INSP-Sprinkler Rough-in/Hydro | 10/6/2005 | 10/6/2005 | 10/6/2005 4:27:40 PM | P | PART |
|
|
Overhead hydrostatic test passed inspection.
|
FIR05-00460
| INSP-Sprinkler Rough-in/Hydro | 10/6/2005 | 10/6/2005 | 10/6/2005 3:03:57 PM | P | PART |
|
|
Underground hydrostatic test and the flush performed post two hour hydro both passed inspection.
|
FIR05-00190
| INSP-Sprinkler Rough-in/Hydro | 10/6/2005 | 10/6/2005 | 10/6/2005 1:42:02 PM | P | PART |
|
|
Overhead piping inspected for cover at soffits in the specials lab.
|
FIR05-00360
| INSP-Sprinkler Rough-in/Hydro | 10/5/2005 | 10/6/2005 | 10/6/2005 11:04:13 AM | A | PART |
|
|
Overhead sprinkler rough in is good for cover, one head at nw corner office is overspaced at approximately 200ft2 not meeting requirements of note #13 (calced spacing not to exceed 168ft2).
|
FIR05-00406
| INSP-Conference | 10/5/2005 | 10/6/2005 | 10/6/2005 9:38:21 AM | A | DONE |
|
|
On site discussion with Mark regarding completion of required work in phased projects, specifically two rooms which cannot be completed until the tenant moves to the newly remodeled area.
|