FIR08-00354
| INSP-Sprinkler Rough-in | 10/6/2008 | 10/6/2008 | 10/6/2008 3:52:55 PM | P | PASS |
|
|
The remaining underground piping can be covered
|
BLD08-01910
| FIRE-Final Inspection | 10/6/2008 | 10/6/2008 | 10/6/2008 3:34:40 PM | P | FAIL |
|
|
Provide approved single action hardware on all of the office doors. Provide a racking permit for the racks over 8' or reduce the height of the racks as discussed. Move the stored items on the floor from infront of the exit doors.
|
FIR08-00553
| INSP-Final Inspection | 10/2/2008 | 10/6/2008 | 10/6/2008 2:36:41 PM | A | FAIL |
|
|
See the city approved plans for deficiencies that include knox box, signage on facp room door, map at annunciator, as-builts and provide a ceiling in the facp room.
|
BLD08-01106
| FIRE-Final Inspection | 10/3/2008 | 10/6/2008 | 10/6/2008 1:41:47 PM | A | FAIL |
|
|
Need the project related fire alarm permit finaled. I did note that the keyed hardware out of the northwest corner of the business needs single action hardware installed. The exit signs and emergency lights tested ok. The fire extinguishers were being placed as I left and position as shown on the plans will need to be verified.
|
FIR08-00364
| INSP-Final Inspection | 10/2/2008 | 10/6/2008 | 10/6/2008 1:04:21 PM | A | CANC |
|
|
BEN MacDONAGH Phone #: ###-#### Internet Inspection Request from: Randy Vail
|
FIR07-01018
| INSP-Final Inspection | 10/2/2008 | 10/6/2008 | 10/6/2008 12:58:04 PM | A | CANC |
|
|
Mike Bierman is the contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus
|