Inspections for the day of: Monday, October 6, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01415 BLD-Aging Inspection10/6/200810/6/200810/7/2008 9:42:38 AM PASS
Stop by and spoke with store clerk. Gave her permit desk phone number and explained that they still needed to call for life/safety and bldg. finals. Clerk noted that she would cal her manager and get insp. scheduled.
ESC08-00152 Random Inspection10/6/200810/6/200810/6/2008 4:34:22 PMPPASS
ESC permit sign posted. Site looked good. All BMP's in place.
BLD08-00418 BLD-Framing/Rough-in10/6/200810/6/200810/6/2008 4:33:45 PMPPART
1st layer 5/8 type for ceiling assembly.
BLD08-02024 BLD-Framing/Rough-in10/3/200810/6/200810/6/2008 3:11:02 PMPPART
steve -- ceiling insp Phone #: ###-####Needs to add seismic strut, Fixed sysytem being used as per plan to match the existing system. pending elec and fire sprinkler.
ESC08-00294 Random Inspection10/6/200810/6/200810/6/2008 3:09:19 PMPPASS
ESC permit sign posted. General site conditions were good.
BLD08-00736 BLD-Other10/6/200810/6/200810/6/2008 3:08:45 PMPPASS
fred Note: beams Phone #: ###-####
BLD08-02133 BLD-Conference10/3/200810/6/200810/6/2008 11:47:20 AMADONE
call 1st before insp --santiago Phone #: ###-####. Called and spoke with Santiago, told him that he would need mech, and elec. permits and schedule conf. with each individual inspector to see what would be required for insp. to get job completed.
BLD08-01200 BLD-Final10/3/200810/6/200810/6/2008 11:45:21 AMANR
Scheduled by a contractor via Hello! on 10/3/2008 at 4:14:52 PM. Contact: ###-####. Still needs elec. final. Contractor was contacted.
BLD08-01332 BLD-Framing/Rough-in10/3/200810/6/200810/6/2008 9:55:48 AMAFAIL
lee - ceiling grid insp Phone #: ###-####. nOT INSTALLED AS PER APPROVED PLAN