BLD09-01116
| BLD-Aging Inspection | 10/6/2009 | 10/6/2009 | 10/6/2009 4:09:52 PM | | NR |
|
|
|
BLD09-00965
| BLD-Framing/Rough-in | 10/6/2009 | 10/6/2009 | 10/6/2009 4:08:28 PM | P | PASS |
|
|
Jared Phone #: ###-####. Interior framed walls under mezz, mezz framing and roof framing ok.
|
BLD09-01072
| BLD-Final | 10/5/2009 | 10/6/2009 | 10/6/2009 1:53:48 PM | P | FAIL |
|
|
Rustin Phone #: ###-####. Needs to provide egress ladders in window wells, handrail to basement is mounted to low. c/n posted. A seperate will be required to finish the basement.
|
ESC09-00398
| Site Final | 10/6/2009 | 10/6/2009 | 10/6/2009 1:51:57 PM | P | FAIL |
|
|
70% reveg. not achieved.
|
BLD09-00244
| BLD-Conference | 10/6/2009 | 10/6/2009 | 10/6/2009 9:50:55 AM | A | PART |
|
|
Received paper work from enginner of record regarding shear wall strapping in area 4. Letter states that the installed straps are sufficient for the lateral overturning loads. Will have letter scanned into permit.
|
BLD09-01044
| BLD-Aging Inspection | 10/6/2009 | 10/6/2009 | 10/6/2009 8:59:36 AM | | PASS |
|
|
Work in progress on site work.
|