MEC10-03056
| Rough-in | 10/6/2010 | 10/6/2010 | 10/6/2010 5:11:24 PM | P | PART |
|
|
oleg Phone #: ###-####...20lb gas ok...posted c/n on window
|
MIS10-00287
| MEC-Conference | 10/6/2010 | 10/6/2010 | 10/6/2010 4:34:49 PM | P | PASS |
|
|
no work being done at this time
|
MEC10-03048
| Final | 10/6/2010 | 10/6/2010 | 10/6/2010 4:33:32 PM | P | PASS |
|
|
w/h
|
MEC10-03048
| Rough-in | 10/6/2010 | 10/6/2010 | 10/6/2010 4:33:00 PM | P | PASS |
|
|
w/h change out
|
MEC10-03048
| Final | 10/5/2010 | 10/6/2010 | 10/6/2010 4:32:35 PM | A | NR |
|
|
Steve Phone #: ###-####..rescheduled for pm
|
MEC10-02792
| Pressure Test | 10/5/2010 | 10/6/2010 | 10/6/2010 12:17:49 PM | A | PASS |
|
|
will be ready by 9:30 AM Phone #: ###-#### >> Inspection requested via web by tom bratcher...20lb gas to future range ok
|
MEC10-03045
| Rough-in | 10/5/2010 | 10/6/2010 | 10/6/2010 12:16:43 PM | A | PASS |
|
|
oleg Phone #: ###-####...r/i and gas ok
|
MEC10-03031
| Final | 10/5/2010 | 10/6/2010 | 10/6/2010 10:55:55 AM | A | PASS |
|
|
Ready for final..onsite contact is Padraic ###-####....thanks carol Phone #: ###-#### >> Inspection requested via web by Carol Hazen...no change on the gas line...installed all but the venting on both boilers
|
MEC10-03002
| Rough-in | 10/1/2010 | 10/6/2010 | 10/6/2010 10:14:41 AM | A | FAIL |
|
|
Daniel ###-####...need a ladder down into crawl...no electrical in r/a plenum
|
MEC10-02039
| Final | 10/1/2010 | 10/6/2010 | 10/6/2010 10:02:06 AM | A | PASS |
|
|
Please do final, please call the office for the key locate or contact Darin ###-#### Phone #: ###-#### >> Inspection requested via web by Diane Myslivy
|