Inspections for the day of: Thursday, October 6, 2011.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00179 BMP Violation10/5/201110/6/201110/7/2011 8:11:52 AMPPASS
storm drains
ESC11-00386 General Inspection10/6/201110/6/201110/7/2011 7:17:37 AM FAIL
Need to initiate stabilization.
ESC11-00660 BMP Violation10/6/201110/6/201110/6/2011 4:11:00 PMPFAIL
Verbal to RP:
CLean up all sediment and debris off of all hard surfaces. Try to miniumize any turbid discharge for of the disturb soil on the lot to the gutterpan. Recommended to add double external protection to the storm drain inlet. Will follow up on 10/7/2011.
ESC11-00549 BMP Violation10/6/201110/6/201110/6/2011 4:10:46 PMPFAIL
Verbal to RP:
CLean up all sediment and debris off of all hard surfaces. Try to miniumize any turbid discharge for of the disturb soil on the lot to the gutterpan. Recommended to add double external protection to the storm drain inlet. Will follow up on 10/7/2011.
ESC11-00547 BMP Violation10/6/201110/6/201110/6/2011 4:10:32 PMPFAIL
Verbal to RP:
CLean up all sediment and debris off of all hard surfaces. Try to miniumize any turbid discharge for of the disturb soil on the lot to the gutterpan. Recommended to add double external protection to the storm drain inlet. Will follow up on 10/7/2011.
ESC11-00546 BMP Violation10/6/201110/6/201110/6/2011 4:10:18 PMPFAIL
Verbal to RP:
CLean up all sediment and debris off of all hard surfaces. Try to miniumize any turbid discharge for of the disturb soil on the lot to the gutterpan. Recommended to add double external protection to the storm drain inlet. Will follow up on 10/7/2011.
ESC11-00548 BMP Violation10/6/201110/6/201110/6/2011 4:10:06 PMPFAIL
Verbal to RP:
CLean up all sediment and debris off of all hard surfaces. Try to miniumize any turbid discharge for of the disturb soil on the lot to the gutterpan. Recommended to add double external protection to the storm drain inlet. Will follow up on 10/7/2011.
ESC11-00174 Aging Inspection10/6/201110/6/201110/6/2011 2:15:46 PM PASS
ESC11-00223 General Inspection10/6/201110/6/201110/6/2011 2:14:08 PM PASS
ESC11-00315 Aging Inspection10/6/201110/6/201110/6/2011 2:13:47 PM PASS
ESC11-00698 Site Preparation10/6/201110/6/201110/6/2011 2:13:34 PM PASS