ELE12-01179
| ELE-Aging Inspection | 10/6/2014 | 10/6/2014 | 10/6/2014 3:03:56 PM | | DONE |
|
|
Waiting on owner
|
ELE14-02768
| Electrical Rough-In | 10/6/2014 | 10/6/2014 | 10/6/2014 2:59:23 PM | P | PASS |
|
|
Please call ###-#### for access Phone #: ###-#### Inspection requested via web by David Nelson Floor heat rough in ok cover
|
ELE14-02280
| Final | 10/5/2014 | 10/6/2014 | 10/6/2014 2:07:17 PM | P | PASS |
|
|
final inspection building A contact ####-#### andy . Phone #: ###-#### Inspection requested via web by andrew dopieralski Final ok
|
ELE14-02753
| Rough-In Permanent Service | 10/2/2014 | 10/6/2014 | 10/6/2014 1:18:45 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI Rough in ok cover p/s u/g n ok
|
ELE14-02730
| Final | 10/3/2014 | 10/6/2014 | 10/6/2014 12:11:41 PM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt Needed ri p/s
|
ELE14-02730
| Rough-In Permanent Service | 10/1/2014 | 10/6/2014 | 10/6/2014 12:10:36 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt Rough in ok cover p/s u/g n ok
|
ELE14-02710
| Conference | 10/6/2014 | 10/6/2014 | 10/6/2014 11:27:45 AM | P | DONE |
|
|
Conference to figure out ufer ground Phone #: ###-#### Inspection requested via web by Thomas Jenkins Concrete encased and building steel are grounding electrodes for this service. 250.52 Grounding Electrodes. (A) Electrodes Permitted for Grounding (3) Concrete-Encased Electrode. A concrete-encased electrode shall consist of at least 6.0 m (20 ft) of either (1) or (2): (1) One or more bare or zinc galvanized or other electrically conductive coated steel reinforcing bars or rods of not less than 13 mm (1/2 in.) in diameter, installed in one continuous 6.0 m (20 ft) length, or if in multiple pieces connected together by the usual steel tie wires, exothermic welding, welding, or other effective means to create a 6.0 m (20 ft) or greater length; or (2) Bare copper conductor not smaller than 4 AWG
|
ELE14-02334
| Final | 10/5/2014 | 10/6/2014 | 10/6/2014 11:13:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Berthelot Final ok
|
ELE14-02335
| Final | 10/5/2014 | 10/6/2014 | 10/6/2014 11:12:54 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Chris Berthelot Bldg ok occupy parking lot pole lights not ready.
|
ELE14-01666
| Final | 10/6/2014 | 10/6/2014 | 10/6/2014 10:47:16 AM | A | PART |
|
|
Please call me. We need to get a partial final. They want a partial occupancy. Thank you, Greg. Phone #: ###-#### Inspection requested via web by Greg Idsinga Spaces 7, 12 thru 28 ok occupy. Unfinished spaces 1 thru 6 and 8 thru 11 not ready
|
ELE14-00775
| Electrical Rough-In | 10/6/2014 | 10/6/2014 | 10/6/2014 10:03:33 AM | A | PASS |
|
|
Ceiling Cover. Toby is the onsite contact Phone #: ###-#### Inspection requested via web by Buster Bowen maternity and nurses area grid rough in ok cover
|
ELE14-02758
| Permanent Service | 10/3/2014 | 10/6/2014 | 10/6/2014 9:42:23 AM | A | FAIL |
|
|
Re energize, power off over a year. Phone #: ###-#### Inspection requested via web by Eric Schroeder BCC- To energize service which has been off for extended period of time grounding shall be brought up to current code cycle, 2008. 250.53(A)(2)- Single piping system shall be supplemented by additional grounding electrode. 4-05-32- Code violation not to be retained. 334.40- NM cable splice or tap shall be in a box. NM cable shall not be installed where subject to physical damage.
|