Inspections for the day of: Monday, October 6, 2014.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00460 INSP-Sprinkler Rough-in10/3/201410/6/201410/6/2014 6:06:35 PMPCANC
Bldg B 3rd Floor
Please call Roy 30 mins prior Phone #: ###-#### Inspection requested via web by Jacci Hunt *Inspection request intended for a different project- Wrong permit number
FIR14-00344 INSP-Sprinkler Rough-in10/3/201410/6/201410/6/2014 6:04:33 PMPPART
Completed inspection for cover at building area B 3rd floor. Items noted include; one restroom missing a sprinkler head per plan-(install or remove from plan per NFPA exceptions), missing coverage at a housekeeping closet, areas not completed at this time include 2"main at corridor, elevator lobby, mechanical, data, and trash rooms. Adjustments to coverage at three locations completed while on site. Discussed fire stop at joist channels <160ft3.
FIR14-00583 INSP-Sprinkler Rough-in10/3/201410/6/201410/6/2014 5:53:07 PMPPART
Fire sprinkler work approved for cover at the new cath lab. Need to provide a drop ceiling or extend sheetrock to the deck for upright coverage at two equipment rooms adjacent to the lab.