ESC13-01124
| General Inspection | 10/6/2014 | 10/6/2014 | 10/6/2014 2:28:05 PM | | PASS |
|
|
waiting for re-vegetation establishment practices to achieve the required 80% above native background vegetation
|
ESC11-00192
| General Inspection | 10/6/2014 | 10/6/2014 | 10/6/2014 2:05:15 PM | | PASS |
|
|
No esc issues observed at this time. only vertical construction taking place
|
ESC14-00296
| Complaint Inspection | 10/6/2014 | 10/6/2014 | 10/6/2014 1:36:28 PM | P | PART |
|
|
Contacted by Robbin Finch PW. He stated he recieved a Complaint for Tracking Control (Trackout) from main st onto Capital. I walked the entire Site and was not concerned. I called Mike Koci and Left a VM disclosing the Complaint, and that a Contruction Entrance/Exit needs to be installed on the Capital Blvd exit to reduce trackout potential. I have yet to hear back from Mike
|
ESC11-00192
| Complaint Inspection | 10/6/2014 | 10/6/2014 | 10/6/2014 1:35:32 PM | P | CANC |
|
|
Entered Incorrect ESC Number
|
ESC13-00895
| General Inspection | 10/6/2014 | 10/6/2014 | 10/6/2014 12:32:55 PM | | PASS |
|
|
see final
|
ESC13-00895
| DOC - Permit Finaled | 10/6/2014 | 10/6/2014 | 10/6/2014 12:32:21 PM | P | PASS |
|
|
ESC Portion Complete. Other permits still open. No esc issues
|
ESC09-00761
| Aging Inspection | 10/6/2014 | 10/6/2014 | 10/6/2014 12:29:30 PM | | PASS |
|
|
WIP: No Violations Observed at this time
|