MEC96-02911
| INSP - Gas pressure test | 10/4/1996 | 10/7/1996 | 10/7/1996 12:00:00 AM | A | CANC |
|
|
10/07/96 350 - ###-#### OROWHEAT BAKERY TALKED TO PLUMBER, HE SAID THEY HADN'T DONE ANY PIPING FROM LAST TEST
|
MEC96-02918
| INSP - Retro Fit (check note) | 10/4/1996 | 10/7/1996 | 10/7/1996 12:00:00 AM | A | PASS |
|
|
10/07/96 350 - CALL ###-#### FOR ACCESS GAS TO GAS FURNACE OK FINAL
|
BLD95-00590
| INSP - Foundation | 10/4/1996 | 10/7/1996 | 10/7/1996 12:00:00 AM | A | PASS |
|
|
10/07/96 350 - BUILDER IS CONTRACTORS NORTHWEST RE-BAR INSPECTION WENT WITH WES TO LANDER STREET, REBAR OK FOR COVER
|
BLD96-01812
| INSP - Carpentry | 10/4/1996 | 10/7/1996 | 10/7/1996 12:00:00 AM | A | FAIL |
|
|
10/07/96 350 - FIRE SHAFT FAILED NEED TO SEAL JOINTS ON INTERIOR TIGHT A SHAFT UP TO THE ROOF SHEATHING.
|
BLD96-02121
| INSP - Framing/Rough-in | 10/4/1996 | 10/7/1996 | 10/7/1996 12:00:00 AM | A | PART |
|
|
10/07/96 350 - APPT.BETWEEN 9 & 9:30 A.M. WES WANTS YOU TO GO WITH HIM. CORRECTIONS ON FRAME, OK TO INSULATE BY #342
|
BLD96-02658
| INSP - Roof | 10/7/1996 | 10/7/1996 | 10/7/1996 12:00:00 AM | P | CANC |
|
|
10/07/96 350 - TO BE DONE BY #342
|
BLD96-00467
| INSP - Framing/Rough-in | 10/7/1996 | 10/7/1996 | 10/7/1996 12:00:00 AM | P | FAIL |
|
|
10/07/96 350 - CORRECTIONS NOT OK TO INSULATE
|
MEC96-02923
| INSP - Gas pressure test | 10/7/1996 | 10/7/1996 | 10/7/1996 12:00:00 AM | P | PASS |
|
|
10/07/96 350 - P/T OK #32912, MOVED METER FINAL
|
MEC96-02915
| INSP - Retro Fit (check note) | 10/4/1996 | 10/7/1996 | 10/7/1996 12:00:00 AM | P | PASS |
|
|
10/07/96 350 - GAS TEST WITH FINAL TO FOLLOW P/T OK #32993 FIREPLACE LOGS OK DAMPER REMOVED FINAL
|
MEC96-02080
| INSP - Final | 10/7/1996 | 10/7/1996 | 10/7/1996 12:00:00 AM | P | PASS |
|
|
10/07/96 350 - RE-INSPECTION CORRECTIONS MADE FINAL ì
|
MEC96-02080
| INSP - Final | 10/7/1996 | 10/7/1996 | 10/7/1996 12:00:00 AM | P | PASS |
|
|
10/07/96 350 - RE-INSPECTION CORRECTIONS MADE FINAL ì
|