PLM02-02992
| Plumbing Rough-in | 10/4/2002 | 10/7/2002 | 10/7/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/04/2002 at 15:45:06. Contact: ###-####. ok to cover walls, hang abs vent every 4', do not hang water line from abs vent. 10/7/2002 10:52:53 AM
|
PLM02-03026
| Plumbing Rough-in | 10/4/2002 | 10/7/2002 | 10/7/2002 12:00:00 AM | A | FAIL |
|
|
###-#### robert waste test failed 10/7/2002 2:05:30 PM
|
PLM02-03049
| Water and/or Sewer | 10/7/2002 | 10/7/2002 | 10/7/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-03053
| Water and/or Sewer | 10/7/2002 | 10/7/2002 | 10/7/2002 12:00:00 AM | P | PART |
|
|
###-#### ok to cover exterior, hang kitchen sink waste every 4', regrade building drain. 10/7/2002 1:54:36 PM
|
PLM02-03012
| Plumbing Rough-in | 10/7/2002 | 10/7/2002 | 10/7/2002 12:00:00 AM | P | FAIL |
|
|
###-#### move upstairs tub trap in cantalever to inside warm wall of house 10/7/2002 4:18:02 PM
|