Inspections for the day of: Friday, October 7, 2005.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorLee Rice
TitlePLM-CHIEF INSPECTOR
Phone #794-9486
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC05-03243 Pressure Test10/7/200510/7/200510/7/2005 5:06:36 PMPPASS
MEC05-03243 Final10/7/200510/7/200510/7/2005 5:06:13 PMPPASS
MEC05-02896 Final10/7/200510/7/200510/7/2005 4:04:51 PMPFAIL
Scheduled by a contractor via Hello! on 10/7/2005 at 7:43:11 AM. Contact: ###-####.need two hole straps on blocks next to units and probably retest or soap test. 1 inch of thread showing on 3/4 inch joints at units.
MEC05-03243 Pressure Test10/6/200510/7/200510/7/2005 12:27:25 PMANH
patrick ###-####
MEC05-03243 Final10/6/200510/7/200510/7/2005 12:12:25 PMANH
patrick ###-####
MEC05-01945 Rough-in10/7/200510/7/200510/7/2005 11:44:19 AMPPASS
preston; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
MEC05-02364 Pressure Test10/6/200510/7/200510/7/2005 11:27:05 AMAPASS
Scheduled by a contractor via Hello! on 10/6/2005 at 4:23:21 PM. Contact: ###-####.
MEC05-02364 Rough-in10/6/200510/7/200510/7/2005 11:26:13 AMAPASS
Scheduled by a contractor via Hello! on 10/6/2005 at 4:22:49 PM. Contact: ###-####.