Inspections for the day of: Friday, October 7, 2005.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01061 BLD-Final10/6/200510/7/200510/7/2005 5:30:48 PMPPASS
Scheduled by a contractor via Hello! on 10/6/2005 at 8:50:47 PM. Contact: ###-####.
C/C issued.
BLD05-02281 BLD-Framing/Rough-in10/7/200510/7/200510/7/2005 5:30:05 PMPFAIL
chuck; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Need all trade R/i Approvals
BLD05-00962 BLD-Foundation10/5/200510/7/200510/7/2005 5:29:00 PMPPASS
Scheduled by a contractor via Hello! on 10/5/2005 at 3:57:45 PM. Contact: ###-####.
BLD05-02277 BLD-Final10/6/200510/7/200510/7/2005 3:38:50 PMPPASS
ben ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
C/C issued
BLD05-02550 BLD-Concrete10/7/200510/7/200510/7/2005 3:33:30 PMPPART
tony; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
North wall ok
BLD05-01608 BLD-Conference10/6/200510/7/200510/7/2005 3:32:52 PMPDONE
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD05-02582 BLD-Foundation10/6/200510/7/200510/7/2005 2:47:41 PMPPART
foundation wall insp//early pm please//sean; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Bsmnt walls ok
BLD05-01955 BLD-Energy code compliance10/6/200510/7/200510/7/2005 2:44:50 PMPFAIL
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
complete c/n
BLD04-02996 BLD-Final10/6/200510/7/200510/7/2005 1:25:48 PMPPART
pete; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
OK for Temp Occ. C/N obtain per occ status within 90 days of this notice.........OK for Perm Occ. when Mech signs off for Perm Occ. ():
BLD05-02196 BLD-Framing/Rough-in10/6/200510/7/200510/7/2005 12:49:46 PMAPART
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Partial framing ...storefront, restrooms, corridor, partition walls OK. Discussed issues with framer about continuity of 1hr fire partition walls between tenants. Have not framed wall between existing 2hr stair tower and new 1hr corridor.....This will cause a problem with transition from 2hr to 1hr rating.....Need continuous membrane in these areas for rating.... Need to call for inspections as needed and not cover areas effected until we inspect them. Need to verify existing Fire partition walls are fire stopped floor to roof deck.
BLD05-01900 BLD-Framing/Rough-in10/6/200510/7/200510/7/2005 12:26:59 PMAPART
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Framing for fire partition walls OK......Talked to Bob about 1hr rating and continuity of fire partition up to roof deck. Many duct penitrations and no way of verifying dampers. Will have Lee Rice look at.
BLD05-01276 BLD-Framing/Rough-in10/6/200510/7/200510/7/2005 10:46:12 AMAPASS
Scheduled by a contractor via Hello! on 10/6/2005 at 6:07:56 PM.
F & Energ OK..... 5mi W Overland R Oriole R Hummingb L Tang Left side into culdesac
BLD05-02505 BLD-Framing/Rough-in10/6/200510/7/200510/7/2005 12:00:00 AMACANC
or ###-####///Early am please///gayle; Phone #: ###-#### Internet Inspection Request from: Barbara Moore canc gayle to reschedule
MIS05-00102 DOC - Permit Finaled10/7/200510/7/200510/7/2005 12:00:00 AMPPASS
BLD05-02277 DOC - Permit Finaled10/7/200510/7/200510/7/2005 12:00:00 AMPPASS
BLD03-01061 DOC - Permit Finaled10/7/200510/7/200510/7/2005 12:00:00 AMPPASS