FIR08-00247
| INSP-Final Inspection | 10/6/2008 | 10/7/2008 | 10/8/2008 4:40:54 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR08-00133
| INSP-Final Inspection | 10/6/2008 | 10/7/2008 | 10/8/2008 4:40:26 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR08-00132
| INSP-Final Inspection | 10/6/2008 | 10/7/2008 | 10/8/2008 4:40:04 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR06-00620
| INSP-Alarm Testing | 10/3/2008 | 10/7/2008 | 10/7/2008 5:38:28 PM | A | PART |
|
|
Inspection completed for cleanroom area ceiling mounted heat detectors only, need to provide accurate addressing at plenum #5, install one missing junction box cover. Intelligent detectors not tested at this time.
|
FIR08-00436
| FIR-Aging Inspection | 10/7/2008 | 10/7/2008 | 10/7/2008 5:33:05 PM | | DONE |
|
|
Work in progress, construction underway.
|
FIR08-00371
| INSP-Final Inspection | 10/6/2008 | 10/7/2008 | 10/7/2008 1:34:04 PM | P | CANC |
|
|
darsey Phone #: ###-####
|
FIR08-00640
| INSP-Sprinkler Rough-in/Hydro | 10/6/2008 | 10/7/2008 | 10/7/2008 1:33:28 PM | A | NR |
|
|
bruce Phone #: ###-#### Inspection to be rescheduled per conversation with contractor.
|
FIR07-01051
| INSP-Sprinkler Rough-in | 10/6/2008 | 10/7/2008 | 10/7/2008 1:31:33 PM | A | PART |
|
|
Overhead rough-in for areas D and E 1st floor as red lined with todays date are approved except as noted on plans sheet 6 and 7. Items include adding missing coverage at the mechanical room/chase between the restrooms, provide sway bracing at the end mains per NFPA 13 2007 9.3.5.3.4, noted two missing hangers, pipe hangers above hard lid ceilings below the stairways and at the mechanical room okayed.
|