Inspections for the day of: Tuesday, October 7, 2008.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00687 Tracking Control9/30/200810/7/200810/8/2008 2:09:25 PMAPASS
ESC08-00624 Complaint Inspection10/7/200810/7/200810/8/2008 7:46:38 AMPDONE
Spoke with the complaintee over the issue of the lot to the south of his land nad told him over the discussion that I had with the RP over final stabilizing with landscape that will be occuring with in the next week.
ESC07-01475 General Inspection10/6/200810/7/200810/7/2008 3:25:27 PMADONE
Went over the perventitive measures with the RP to get there site ready for the winter.
ESC07-01005 BMP Violation10/7/200810/7/200810/7/2008 3:24:34 PMPCANC
Wrong Date.
ESC07-01005 Random Inspection10/7/200810/7/200810/7/2008 3:22:39 PMPFAIL
Left a message with The developer David O'Niel (###-####)
Correction Notice:
1. Clean all sediment off of hard surfaces.
2. Set up a New RP for the project.
3. Maintain and install bmp's where needed.
Will re-inspet 10/8/08 PM
ESC08-00718 BMP Violation10/3/200810/7/200810/7/2008 2:36:26 PMADONE
Moved to a Stop work order.
ESC08-00718 INSP - Stop Work Order10/7/200810/7/200810/7/2008 2:30:48 PMPFAIL
1. Clean up all sediment and debris out onto the street.
2. Protect all storm drains with approved protection.
3. Install an approved construction entrance.
No work inside of the project can occur until all issues have been dealt with, an inspection from me (Clint Smith) to pull the stop work order.
ESC08-00516 General Inspection10/7/200810/7/200810/7/2008 1:37:44 PMAFAIL
Told RP to fix the silt fence and clean up any sediment off of the parking lot by the end of the week.
ESC07-01246 Random Inspection10/7/200810/7/200810/7/2008 10:47:08 AMAFAIL
Clean up storm drain inlets and all sediment and debris out of the alley way and gutter pan on Beacon and Longmont.
Spoke with the RP ove the pertaining issues with the site. Will be completed by the end of the day.
ESC08-00774 Tracking Control10/7/200810/7/200810/7/2008 10:35:37 AMAFAIL
Clean up sediment in the srteet and gutterpan where sidewalk work was completed. Also fill out the ESC sign with the proper info.
ESC08-00178 BMP Violation10/7/200810/7/200810/7/2008 9:27:36 AMAFAIL
Verbal Notice:
Clean up all sediment (land berm) off of 12th st by the end of the day.
Put a catch under the concrete pump truck during pour. Will re-inspect on 10/8/08
ESC08-00759 Random Inspection10/7/200810/7/200810/7/2008 9:14:18 AMPPASS
ESC08-00079 General Inspection10/7/200810/7/200810/7/2008 9:05:17 AMAPASS
No issues at the present time.
ESC08-00080 General Inspection10/7/200810/7/200810/7/2008 9:05:05 AMAPASS
No issues at the present time.
ESC07-01522 Random Inspection10/7/200810/7/200810/7/2008 9:04:11 AMAPASS
No issues at the present time.
ESC08-00083 General Inspection10/7/200810/7/200810/7/2008 9:02:11 AMAPASS
No issues at the present time.
ESC08-00081 General Inspection10/7/200810/7/200810/7/2008 9:01:55 AMAPASS
No issues at the present time.