Inspections for the day of: Wednesday, October 7, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00519 INSP-Final Inspection10/7/200910/7/200910/7/2009 5:00:38 PMPNR
Final pending missing ceiling tile and escutcheons.
BLD09-01425 FIRE-Final Inspection10/6/200910/7/200910/7/2009 4:59:38 PMAPASS
Fire life safety final okay pending installation of one fire extinguisher, post max occupant load sign, repair one EM light at the back exit corridor. Items to be done prior to structural final approval.
FIR09-00498 INSP-Final Inspection10/5/200910/7/200910/7/2009 4:54:37 PMAPASS
Scope of fire alarm permit work passed inspection, permit finaled.
FIR09-00413 INSP-Sprinkler Rough-in10/6/200910/7/200910/7/2009 1:53:17 PMAPART
Remainder of overhead work okayed for cover with the exception of two locations clouded on plans including the one upright at the server room to be relocated and an overspaced head due to floorplan changes at the locker area.
FIR09-00576 INSP-Final Inspection10/7/200910/7/200910/7/2009 1:49:45 PMAPASS
Fire alarm system modifications passed field testing, okay for final.
FIR09-00569 INSP-Final Inspection10/6/200910/7/200910/7/2009 1:48:36 PMAPASS
Hood suppression systems operated correctly under test conditions, contractor to provide a current certification for the K class extinguisher-will be verified at fire life safety final, open junction boxes covered while on site, inspection passed and permit finaled.
BLD09-01676 FIRE-Final Inspection10/5/200910/7/200910/7/2009 1:45:55 PMAPASS
Life safety passed. Note to structural inspector: please verify the fire extinguisher is provided with a current certification tag- tenant to have completed prior to final.