Inspections for the day of: Wednesday, October 7, 2009.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01547 FIRE-Final Inspection10/6/200910/7/200910/7/2009 4:33:47 PMPFAIL
Fire sprinkler coverage needs modified around where the hood was previously located. All other items are ok.
FIR09-00590 INSP-Final Inspection10/7/200910/7/200910/7/2009 3:20:05 PMPPASS
Permit finaled
BLD09-01250 FIRE-Final Inspection10/7/200910/7/200910/7/2009 3:10:51 PMPPASS
life safety passed
FIR09-00584 INSP-Final Inspection10/6/200910/7/200910/7/2009 3:09:18 PMPPASS
Permit finaled.
FIR07-01031 INSP-Final Inspection10/7/200910/7/200910/7/2009 3:08:19 PMPPASS
permit finaled
BLD09-01367 FIRE-Final Inspection10/6/200910/7/200910/7/2009 3:07:19 PMAFAIL
Todays inspection was just for the remaining portion of the remodeled east dressing rooms which has passed life safety.
BLD07-01846 FIRE-Final Inspection10/6/200910/7/200910/7/2009 11:17:31 AMAFAIL
Life safety will be ok to pass when the project related fire alarm and fire sprinkler permits are passed.
FIR09-00150 INSP-Final Inspection10/5/200910/7/200910/7/2009 11:11:11 AMAFAIL
The module monitoring trouble on the NAC panel has been provided and tested. The 18ah batteries are now added and both sets of approved plans are on site. The EOL voltage is passed on the circuit over the office area of the building. The inspection was stopped from sending additional signals due to the AES panel being at a Netcom 6. It temporarily went to a Netcom 5 but then went back to a 6. Also the sound from the horns on the notification circuit is not sync'd as required per NFPA 72 Chapter 6. Placement of the notification devices appeared to be ok except back in a storage room where the strobe was not placed as per the plan and now coverage is lacking. This device will need to be relocated or an additional device added.
BLD07-01834 FIRE-Final Inspection10/6/200910/7/200910/7/2009 11:04:21 AMAPASS
Life safety is passed.
BLD09-00982 FIRE-Final Inspection10/6/200910/7/200910/7/2009 9:38:09 AMAFAIL
Need the ADA hardware for the two pocket doors and the remote annunciator for the duct smoke detector installed and tested.
BLD09-01653 FIRE-Final Inspection10/6/200910/7/200910/7/2009 9:34:43 AMACANC
###-#### Refugio//inspection for temp sign off to operate restaurant portion of tenant space. Canceled per telephone conversation.
FIR09-00590 INSP-Alarm Testing10/6/200910/7/200910/7/2009 8:44:36 AMAPASS
Scheduled by a contractor via Hello! on 10/6/2009 at 4:21:40 PM. Contact: ###-####.
FIR09-00570 INSP-Final Inspection10/6/200910/7/200910/7/2009 8:38:08 AMAPASS
Hood suppression system operated correctly. Lights turned off and the gas shut off.
FIR09-00365 INSP-Final Inspection10/6/200910/7/200910/7/2009 7:10:31 AMAPASS
Permit finaled