ESC10-00736
| Site Preparation | 10/7/2010 | 10/7/2010 | 10/8/2010 11:20:36 AM | | PART |
|
|
Unstablized site, not ready to final. Final not site preparation inspection.
|
ESC10-00657
| General Inspection | 10/7/2010 | 10/7/2010 | 10/7/2010 2:53:59 PM | P | PART |
|
|
Verbal to Mike at Avalon: Install additional sediment barriers on each side of the slope next to the perimeter silt fence. As well re-install drainage sediment barriers at the end of the day. All installation is needed by the end of day as a possible serious rain event is forecasted this evening and overnight.
|
ESC10-00643
| Site Preparation | 10/7/2010 | 10/7/2010 | 10/7/2010 2:10:32 PM | P | PART |
|
|
Blanket needs to be toed in at top of the slope. Slope is hydro-seeded and then the blanket installed. I observed minor "tenting" at misc. locations but hopefully will be ok. Energy relieve (basalt rock) is inplace at the bottome of the seeded slope at the bottom of the buried slope pipe. Informed RP of my comments and observations.
|