MEC11-01884
| Final | 10/7/2011 | 10/7/2011 | 10/7/2011 4:53:25 PM | P | PART |
|
|
call luke 20 min in advance ###-####...temp occ ok...rescheduled for 8:30 mon am so Bill can check equipment on the roof
|
MEC11-03150
| Pressure Test | 10/7/2011 | 10/7/2011 | 10/7/2011 1:32:15 PM | P | PASS |
|
|
20# test ok
|
MEC11-03150
| Rough-in | 10/6/2011 | 10/7/2011 | 10/7/2011 1:30:58 PM | A | FAIL |
|
|
Jason w/TML if needed Phone #: ###-#### >> Inspection requested via web by Michele LaMott permit required for the fire places, fire place flur terminating in the attic, ACCA report and approved design required. 20# test ok
|
MEC11-02744
| Conference | 10/7/2011 | 10/7/2011 | 10/7/2011 12:25:40 PM | A | CANC |
|
|
just needed phone number
|
MEC11-02978
| Final | 9/30/2011 | 10/7/2011 | 10/7/2011 10:29:13 AM | A | PASS |
|
|
Would prefer as early as possible. Contact Kevin 30 mins before arrival. Phone #: ###-#### >> Inspection requested via web by Tom Soniville
|
PLM11-02038
| Plumbing Rough-in | 10/7/2011 | 10/7/2011 | 10/7/2011 9:40:07 AM | A | PASS |
|
|
drinking fountains ok
|
PLM11-01705
| Plumbing Rough-in | 10/7/2011 | 10/7/2011 | 10/7/2011 9:39:44 AM | A | PASS |
|
|
drinking fountains ok
|
MEC11-02351
| Final | 10/7/2011 | 10/7/2011 | 10/7/2011 8:47:25 AM | A | PASS |
|
|
final ok with no mantel installed
|
MEC11-02441
| Final | 10/6/2011 | 10/7/2011 | 10/7/2011 8:44:42 AM | A | PASS |
|
|
jason Phone #: ###-#### - air balance report is located by the furnace final ok
|
MEC11-03037
| Conference | 10/6/2011 | 10/7/2011 | 10/7/2011 8:23:22 AM | A | PASS |
|
|
Please call Arlen at ###-#### with any issues. Phone #: ###-#### >> Inspection requested via web by Arlen Dowdy 20# test final ok
|
MEC11-03037
| Final | 10/7/2011 | 10/7/2011 | 10/7/2011 8:21:54 AM | A | PASS |
|
|
final ok
|
MEC11-03037
| Pressure Test | 10/7/2011 | 10/7/2011 | 10/7/2011 8:21:26 AM | A | PASS |
|
|
20# test ok
|