FIR11-00414
| INSP-Sprinkler Rough-in | 10/7/2011 | 10/7/2011 | 10/7/2011 4:39:00 PM | P | PART |
|
|
Verified corrections, overhead work approved for cover.
|
FIR11-00542
| INSP-Sprinkler Rough-in | 10/7/2011 | 10/7/2011 | 10/7/2011 4:27:08 PM | P | PART |
|
|
One room as marked and dated on plans is approved for ceiling cover.
|
FIR11-00194
| INSP-Sprinkler Rough-in | 10/7/2011 | 10/7/2011 | 10/7/2011 4:26:27 PM | P | PART |
|
|
Only clouded areas marked with today's date okayed for cover. Field install does not match plan at the bi-plane room, floorplan has changed, missing coverage at an electrical closet, one head adjacent to a soffit is blocked.
|
BLD11-02393
| FIRE-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 4:23:05 PM | P | PASS |
|
|
Fire life safety inspection passed. PFE is due annual certification this month.
|
FIR11-00483
| INSP-Supply line flush | 10/6/2011 | 10/7/2011 | 10/7/2011 4:22:01 PM | P | PART |
|
|
UG fire supply line flush completed acceptable.
|
FIR11-00418
| INSP-Sprinkler Rough-in | 10/7/2011 | 10/7/2011 | 10/7/2011 4:20:56 PM | P | PART |
|
|
Overhead modifications at the remodel area okayed for ceiling cover with the exception of one missing head at the file room- to be added and verified at final per discussion.
|
FIR11-00414
| INSP-Sprinkler Rough-in | 10/6/2011 | 10/7/2011 | 10/7/2011 4:19:28 PM | A | FAIL |
|
|
Overspaced head at the 2nd floor, one pendent head at the 2nd floor and three pendent heads at the 1st floor are too close to light fixture junction boxes.
|
FIR10-00346
| INSP-Final Inspection | 10/3/2011 | 10/7/2011 | 10/7/2011 4:16:55 PM | A | PASS |
|
|
Corrections and adjustments made while on site. Network capabilities tested satisfactory, re-inspection items passed. Scope of fire alarm permit finaled.
|