BLD11-00862
| FIRE-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 3:57:13 PM | P | PASS |
|
|
life safety passed
|
FIR11-00477
| INSP-Final Inspection | 10/6/2011 | 10/7/2011 | 10/7/2011 3:30:34 PM | A | CANC |
|
|
Cancel per Jeremy at ###-####
|
FIR11-00242
| INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 3:24:19 PM | P | PASS |
|
|
permit finaled.
|
FIR11-00274
| INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 3:07:01 PM | P | PASS |
|
|
Permit finaled.
|
FIR11-00275
| INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 3:06:19 PM | P | PASS |
|
|
Permit finaled.
|
FIR11-00276
| INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 3:05:47 PM | P | PASS |
|
|
Permit finaled.
|
FIR11-00277
| INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 3:04:49 PM | P | PASS |
|
|
Permit finaled.
|
FIR11-00279
| INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 3:04:29 PM | P | PASS |
|
|
Permit finaled.
|
FIR11-00453
| INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 3:04:08 PM | P | PASS |
|
|
Permit finaled.
|
FIR11-00278
| INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 3:03:32 PM | P | PASS |
|
|
Permit finaled.
|
FIR11-00095
| INSP-Final Inspection | 10/6/2011 | 10/7/2011 | 10/7/2011 2:59:57 PM | A | PASS |
|
|
Permit finaled
|
FIR11-00382
| INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 2:59:40 PM | P | FAIL |
|
|
Phone lines have been fixed. The sprinkler system interconnections (tamper switches, flow switches) tested ok and signals reported correctly.EOL voltages tested ok. The manual pull station is mounted too high and will need to be lowered.To finish the inspection the duct smoke detectors and elevator recall functions need to be tested. I found a door to a secured area on the second floor that shall meet the requirements of IFC 1008.1.4.4. The fire alarm plans need to be resubmitted showing this interconnected with the fire alarm panel as well as showing the correct flow switch and tamper switch counts. I also went over the map requirements for the facp with Clay.
|
BLD11-01119
| FIRE-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 1:02:03 PM | A | FAIL |
|
|
I went over door hardware with the door hardware supplier. He is going to install lever hardware on the west door and leave automatic flush bolts on the inactive leaf. He will provide keyed on the nonrequired door on the northeast corner of the building.
|
FIR11-00382
| INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 10:04:49 AM | A | FAIL |
|
|
The phone lines on the fire alarm panel are not calling out on a primary line and a secondary line as required. Only one line is being used. Inspection stopped. No other items were tested.
|