Inspections for the day of: Friday, October 7, 2011.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00691 Site Preparation10/7/201110/7/201110/13/2011 7:46:31 AM CANC
ESC11-00408 General Inspection10/7/201110/7/201110/13/2011 7:45:24 AM CANC
BLD07-01587 BLD-Aging Inspection10/7/201110/7/201110/10/2011 10:24:28 AM PEND
BLD11-01658 BLD-Energy code compliance10/7/201110/7/201110/7/2011 4:28:02 PMPPASS
As late as possible Phone #: 2720940 >> Inspection requested via mobile web by Mike birch. All framing issues were resolved.
BLD10-02069 BLD-Conference10/7/201110/7/201110/7/2011 3:19:08 PMPPART
Inspection on rebar prior to form placement at new chiller, boiler area.
BLD11-01503 BLD-Final10/7/201110/7/201110/7/2011 2:25:14 PMPPASS
hollis Phone #: ###-####
BLD11-01503 DOC - Permit Finaled10/7/201110/7/201110/7/2011 2:25:05 PMPPASS
BLD07-01586 BLD-Aging Inspection10/7/201110/7/201110/7/2011 11:49:46 AM PEND
BLD07-01585 BLD-Aging Inspection10/7/201110/7/201110/7/2011 11:49:32 AM PEND
ESC11-00190 General Inspection10/7/201110/7/201110/7/2011 11:49:18 AM PASS
GCB11-00060 GCB-Framing10/6/201110/7/201110/7/2011 11:24:06 AMACANC
steve @ ###-####
GCB11-00060 GCB-Energy10/6/201110/7/201110/7/2011 11:23:51 AMAPASS
steve @ ###-####. Energy ok. Still needs to add the lateral bracing at top chords of trussues as noted on energy code.
GCB11-00043 GCB-Energy10/6/201110/7/201110/7/2011 11:08:42 AMAPASS
Darin @ ###-####. 2 layers of 15lb. paper ok.
BLD10-02069 BLD-Conference10/6/201110/7/201110/7/2011 10:41:34 AMAPASS
Shear wall inspection Grid line 23 Phone #: ###-#### >> Inspection requested via web by Scott Greer. Shearwall at gridline 23 ok, as per ASI#23, will need to submit plan mod.
BLD11-02383 BLD-Footing10/6/201110/7/201110/7/2011 10:23:12 AMAPASS
joan please call 15 min before going out. Phone #: ###-####