ESC13-00823
| Site Preparation | 10/7/2013 | 10/7/2013 | 10/7/2013 2:19:50 PM | P | PART |
|
|
Discussed stabilization with RP Roger. He will begin either mulch or hydroseed in the area of disturbance later this week. After re-inspection and approval the BLD and ESC permit may be finaled and the bond released
|
BLD13-02227
| BLD-Final | 10/4/2013 | 10/7/2013 | 10/7/2013 2:18:09 PM | A | PART |
|
|
Roger-Note**will be reseeding before winter call him if you have questions**Please let Barb @ the permit desk know if ok to release bond @ ###-#### Phone #: ###-####.
Called Roger to discuss stabilization. He will be begin either hydroseed or mulch cover in the disturbed area. After completed, he will call for re-inspection and if complete, the bond can be released.
|
ESC13-00082
| General Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 1:15:24 PM | | PASS |
|
|
BMP implemented. No significant trackout at time of inspection. Approved. Construction is ongoing.
|
ESC13-00120
| General Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 11:44:28 AM | | PASS |
|
|
Some interior construction ongoing. Hillside and front have been hydroseeded and is starting to grow. No ESC violations observed. Approved.
|
ESC11-00543
| General Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 11:33:15 AM | | PASS |
|
|
Outside work complete. Work on inside is in progress. No ESC violations. Approved.
|
ESC13-00727
| Site Preparation | 10/4/2013 | 10/7/2013 | 10/7/2013 11:11:56 AM | A | PASS |
|
|
Dan Phone #: ###-####
Site is ready for construction. Discussed daily housekeeping with RP Dan Appel. He is putting inlet protection on newly installed MS4 structure in front of development. Permits posted. Approved.
|
ESC13-00726
| Site Preparation | 10/4/2013 | 10/7/2013 | 10/7/2013 11:11:26 AM | A | PASS |
|
|
Dan Phone #: ###-####
Site is ready for construction. Discussed daily housekeeping with RP Dan Appel. He is putting inlet protection on newly installed MS4 structure in front of development. Permits posted. Approved.
|
ESC11-00879
| General Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 10:45:52 AM | | PASS |
|
|
BMPs in place. No ESC violations at this time. Approved.
|
ESC13-00321
| General Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 10:19:11 AM | | PASS |
|
|
Work in progress. No track out, permit posted on west fence. Approved
|
ESC12-00681
| General Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 10:11:37 AM | | PASS |
|
|
Finaled. See activity notes
|
ESC12-00681
| DOC - Permit Finaled | 10/7/2013 | 10/7/2013 | 10/7/2013 10:08:32 AM | P | PASS |
|
|
Goodman Oil demo is complete and site is in active. Pit run and plant vegetation has stabilized soil Any new activity will require a new ESC permit.
|
ESC10-00787
| General Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 9:59:02 AM | | PASS |
|
|
Building is complete but some final parking lot work and landscaping remains. No track out or other violations.
|
ESC12-00514
| Aging Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 9:42:10 AM | | PASS |
|
|
Finaled, See activity notes.
|
ESC12-00514
| DOC - Permit Finaled | 10/7/2013 | 10/7/2013 | 10/7/2013 9:41:20 AM | P | PASS |
|
|
Pool is installed and landscaping complete. Permit is over 1 year old. No ESC violations. No further ESC inspections required. BLD permit appears to be open.
|
ESC12-01026
| General Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 9:21:36 AM | | PASS |
|
|
Landscaping and irrigation system appear to be complete. Section of grass is still waiting for final stabilization. No ESC violations at time of inspection.
|
ESC11-00844
| Aging Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 9:01:47 AM | | NH |
|
|
No activity at this time. BLD permit is still open.
|