FIR14-00571
| INSP-Sprinkler Rough-in | 10/7/2014 | 10/7/2014 | 10/7/2014 3:58:40 PM | P | PART |
|
|
Completed inspection for cover at the remiander of grid ceiling areas. Data room ceiling is not yet built, need to remove one existing head at the audit room, pendent at the restroom vestibule to be changed to quick response. Refer to plans for dated annotations.
|
FIR14-00663
| INSP-Final Inspection | 10/7/2014 | 10/7/2014 | 10/7/2014 3:53:37 PM | P | PASS |
|
|
Fire alarm work passed functional test. Permit finaled.
|
BLD14-01191
| FIRE-Final Inspection | 10/7/2014 | 10/7/2014 | 10/7/2014 3:11:57 PM | P | PASS |
|
|
Fire life safety inspection completed acceptable. Signage at keyed door added while on site.
|
FIR14-00664
| INSP-Final Inspection | 10/7/2014 | 10/7/2014 | 10/7/2014 3:06:03 PM | P | PASS |
|
|
Fire alarm testing completed satisfactory. Permit finaled.
|
FIR14-00669
| INSP-Final Inspection | 10/7/2014 | 10/7/2014 | 10/7/2014 11:28:38 AM | P | PASS |
|
|
Fire sprinkler work passed final walkthrough. Permit finaled.
|
FIR14-00583
| INSP-Sprinkler Rough-in | 10/7/2014 | 10/7/2014 | 10/7/2014 11:27:29 AM | A | PART |
|
|
Okay to cover remainder of fire sprinkler work at the grid ceilings.
|
BLD14-02419
| FIRE-Final Inspection | 10/6/2014 | 10/7/2014 | 10/7/2014 11:25:18 AM | A | FAIL |
|
|
Refer to plan review annotations on stamped plan set sheets A1.1 and A2.1 for details regarding door hardware and exit signage to be provided prior to final. Remainder of fire life safety items okayed.
|
FIR14-00604
| INSP-Sprinkler Rough-in | 10/6/2014 | 10/7/2014 | 10/7/2014 11:20:09 AM | A | PART |
|
|
Completed rough-in for the dry system building area A as marked/dated on approved plan. Items noted include; one seismic brace to be relocated, insufficient upright protection at one location, significant changes to main and branchline routing due to field conditions will warrant a plan modification to reflect actual installation.
|