Inspections for the day of: Tuesday, October 7, 2014.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00669 INSP-Final Inspection10/7/201410/7/201410/9/2014 2:45:42 PMPPASS
Permit finaled
FIR14-00494 INSP-Final Inspection10/6/201410/7/201410/7/2014 3:33:58 PMPCANC
Cancel per Mike is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
FIR14-00222 INSP-Sprinkler Rough-in/Hydro10/7/201410/7/201410/7/2014 3:21:36 PMPPASS
Overhead hydro test passed on the second try.
FIR14-00471 INSP-Sprinkler Rough-in/Hydro10/7/201410/7/201410/7/2014 2:48:55 PMPPASS
The overhead hydro passed
FIR14-00461 INSP-Supply line flush10/6/201410/7/201410/7/2014 2:48:13 PMAPASS
Underground flush passed
BLD14-00736 FIRE-Final Inspection10/6/201410/7/201410/7/2014 2:13:17 PMPPASS
Life safety passed. Address and sticker to be mounted prior to a building sign off.
BLD13-01938 FIRE-Final Inspection10/6/201410/7/201410/7/2014 2:11:55 PMPPASS
Life safety passed. Address and sticker to be mounted prior to a building sign off.
FIR14-00607 INSP-Final Inspection10/6/201410/7/201410/7/2014 2:11:00 PMPCANC
Cancel per John Phone #: ###-####
BLD14-02865 FIRE-Final Inspection10/7/201410/7/201410/7/2014 2:10:34 PMPFAIL
Provide and mount the fire extinguisher as discussed. Remove or repair the non-functional/non-required exit signs. Also no "repair work" as discussed until the TI permit is inspected/passed.
FIR14-00399 INSP-Sprinkler Rough-in10/6/201410/7/201410/7/2014 11:26:27 AMAPASS
Tenting passed. Piping is ok to cover.
FIR14-00424 INSP-Sprinkler Rough-in10/6/201410/7/201410/7/2014 11:25:57 AMAPASS
Tenting passed. Piping is ok to cover.
FIR14-00632 INSP-Sprinkler Rough-in10/6/201410/7/201410/7/2014 9:57:29 AMAPASS
Rough-in passed. Piping can be covered.
FIR14-00700 INSP-Sprinkler Rough-in10/6/201410/7/201410/7/2014 9:56:50 AMAPASS
Rough-in passed. Piping can be covered.
FIR14-00535 INSP-Sprinkler Rough-in10/6/201410/7/201410/7/2014 8:42:46 AMAPASS
Rough-in passed. No piping can be covered until a tenting inspection has been performed.
FIR14-00492 INSP-Sprinkler Rough-in10/6/201410/7/201410/7/2014 7:52:01 AMAPASS
Tenting inspection passed. Piping can be covered.
FIR14-00137 INSP-Sprinkler Rough-in10/6/201410/7/201410/7/2014 7:51:11 AMAPASS
See the city approved plans for additional areas marked "ok" where piping is ok to cover.