BLD15-03287
| FIRE-Conference | 10/7/2015 | 10/7/2015 | 10/7/2015 1:49:02 PM | P | DONE |
|
|
Went over exit signs
|
BLD15-02193
| FIRE-Final Inspection | 10/7/2015 | 10/7/2015 | 10/7/2015 12:53:22 PM | P | PASS |
|
|
Life safety passed
|
BLD15-02630
| FIRE-Final Inspection | 10/7/2015 | 10/7/2015 | 10/7/2015 12:52:52 PM | P | PASS |
|
|
Life safety passed. Contractor to repair the left bulb of the north emergency light prior to a building sign off.
|
FIR15-00640
| INSP-Sprinkler Rough-in/Hydro | 10/6/2015 | 10/7/2015 | 10/7/2015 10:50:59 AM | A | FAIL |
|
|
Overhead hydro test failed again.
|
FIR15-00656
| INSP-Sprinkler Rough-in/Hydro | 10/6/2015 | 10/7/2015 | 10/7/2015 10:15:11 AM | A | PASS |
|
|
Overhead hydro test and tenting inspection passed. Piping can be covered.
|
FIR15-00657
| INSP-Sprinkler Rough-in/Hydro | 10/6/2015 | 10/7/2015 | 10/6/2015 3:31:21 PM | A | CANC |
|
|
contact - Matt Robison -477 7315 - needs an inspection for an over head hydro inspection and check on tenting/insulation. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|