Inspections for the day of: Wednesday, October 7, 2015.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01004 Tracking Control10/7/201510/7/201510/7/2015 4:54:05 PMPPEND
ESC15-01071 Site Final10/7/201510/7/201510/7/2015 4:53:52 PMPPASS
Demo phase by IDS is complete. BMP installations will remain for vertical construction of hotel covered under ESC15-01004
ESC15-00520 Aging Inspection10/7/201510/7/201510/7/2015 3:28:14 PM PASS
Home addition, remodel earth work complete. Disturbed area stabilized and within landscaped yard. No further ESC inspections needed, permit finaled. BLD open.
ESC15-00520 DOC - Permit Finaled10/7/201510/7/201510/7/2015 3:27:10 PMPPASS
ESC15-00155 Aging Inspection10/7/201510/7/201510/7/2015 2:31:57 PM PASS
Home complete, landscaped, and occupied.
ESC15-00155 DOC - Permit Finaled10/7/201510/7/201510/7/2015 2:31:31 PMPPASS
ESC15-00473 Aging Inspection10/7/201510/7/201510/7/2015 2:23:51 PM PASS
Well house demo complete and pipe is capped. No sediment leaving site. Used as utility service parking spot. No issues.
ESC15-00473 DOC - Permit Finaled10/7/201510/7/201510/7/2015 2:22:58 PMPPASS
ESC15-00200 Site Final10/7/201510/7/201510/7/2015 2:07:51 PMPPASS
All construction and site improvements complete. Temp BMP DI bags on Orchard and Overland have been removed. ESC permit conditions satisfied. Primary Health on Overland now occupied and open for business.
ESC15-00768 Site Final10/7/201510/7/201510/7/2015 2:06:27 PMPPASS
Sign installed. All disturbed areas stabilized, loose sediment cleaned up. Permit conditions satisfied.
ESC15-00288 Aging Inspection10/7/201510/7/201510/7/2015 1:59:02 PM PART
WIP. 3 townhomes (skinny homes) in progress. No significant amounts of sediment leaving site and trash and materials are contained.

Correction: Need to post one yellow permit sign for the 3 projects.
ESC15-00065 General Inspection10/7/201510/7/201510/7/2015 12:33:39 PM PASS
WIP. No sediment runoff or trackout from site. Recent issues regarding wind blown trash have been resolved.

No corrections at this time.
ESC14-01151 General Inspection10/7/201510/7/201510/7/2015 12:13:29 PM PASS
WIP on landscaping and driveway. Will need sweep of materials temporarily stored there.

Construction on interior and exterior home complete. No discharges or hillside erosion issues observed.
ESC15-01188 Site Preparation10/6/201510/7/201510/7/2015 12:04:07 PMAPASS
Eric Phone #: ###-####

Permit sign posted. Site prep for initial excavation. Homeowner wants to preserve all natural vegetation & sagebrush out side of building footprint. Once backfill around house is complete, perimeter sediment control will be installed.

J&H also to hydroseed across Birdsong on disturbed area and install temporary wattle at toe of slope.

Approved.
ESC15-01178 Site Preparation10/6/201510/7/201510/7/2015 11:13:39 AMAPASS
Larry-please call 30 minutes prior to meet-or call ###-#### Phone #: ###-####

DI bag installed on storm drain in front of home. Permit sign posted, trash container provided. GC-RP familiar with ESC conditions. Approved.
ESC15-00957 Complaint Inspection10/7/201510/7/201510/7/2015 10:45:27 AMPFAIL
Complaint called in regarding trackout to Pierce Park south of Hill Road.



Observation:

Bringing in dirt and road mix for road paving which will happen later this week, significant heavy truck traffic in and out of site.


Stabilized entrance was removed for utility installation, so now trackout is occuring.


Called developer/RP Jim Conger to request sweeping ASAP to reduce build up. Got vm, will check back...


Coir mats are installed on the storm drains.


CA paving is the contractor.

ESC15-00320 General Inspection10/7/201510/7/201510/7/2015 9:32:15 AM PASS
ESC14-01106 General Inspection10/7/201510/7/201510/7/2015 8:55:44 AM PASS
WIP, staging area still in use. No trackout or discharges. Work is occuring indoors mostly