FIR16-00569
| INSP-Sprinkler Rough-in | 10/7/2016 | 10/7/2016 | 10/7/2016 2:46:55 PM | P | PASS |
|
|
See the second floor plans where I have notated with todays day the corridor system where piping can be covered.
|
BLD16-01286
| FIRE-Final Inspection | 10/6/2016 | 10/7/2016 | 10/7/2016 1:57:44 PM | A | PASS |
|
|
life safety passed
|
BLD16-01491
| FIRE-Final Inspection | 10/6/2016 | 10/7/2016 | 10/7/2016 1:56:59 PM | A | PASS |
|
|
life safety passed
|
BLD16-00641
| FIRE-Final Inspection | 10/7/2016 | 10/7/2016 | 10/7/2016 10:15:14 AM | P | PASS |
|
|
Life safety passed
|
FIR16-00373
| INSP-Final Inspection | 10/6/2016 | 10/7/2016 | 10/7/2016 10:14:58 AM | A | PASS |
|
|
Permit finaled
|
BLD16-00275
| FIRE-Final Inspection | 10/6/2016 | 10/7/2016 | 10/7/2016 10:07:34 AM | A | PASS |
|
|
Life safety passed
|
BLD16-00733
| FIRE-Final Inspection | 10/6/2016 | 10/7/2016 | 10/7/2016 10:05:18 AM | A | FAIL |
|
|
Need project related fire sprinkler permit finaled. Need smoke alarms relocated to more thant 3' from the bathroom doors.
|
FIR16-00417
| INSP-Final Inspection | 10/6/2016 | 10/7/2016 | 10/7/2016 8:42:08 AM | A | FAIL |
|
|
Need to secure the poly piping in the crawl space every 32" as discussed. The cpvc risers need to be with-in 1 1/2" of the wall as per available listing. Provide fire caulking in the closets as discussed.
|
FIR16-00581
| INSP-Final Inspection | 10/4/2016 | 10/7/2016 | 10/7/2016 8:37:22 AM | A | PASS |
|
|
Permit finaled
|