Inspections for the day of: Friday, October 7, 2016.
Number of inspections: 20
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00408 General Inspection10/5/201610/5/2016   
BLD16-00641 BLD-Final10/7/201610/7/201610/7/2016 5:02:09 PMPNR
Scott Phone #: ###-####. Contractor has not verified removal of dead bolt. Rescheduled for monday 10-10.
BLD16-03427 BLD-Final10/6/201610/7/201610/7/2016 2:51:11 PMPNR
Please call ahead for access - David Phone #: ###-####. fire/life/safety failed.
BLD16-03428 BLD-Final10/6/201610/7/201610/7/2016 2:50:54 PMPNR
Please call ahead for access - David Phone #: ###-####. fire/life/safety failed.
BLD16-03429 BLD-Final10/6/201610/7/201610/7/2016 2:50:37 PMPNR
Please call ahead for access - David Phone #: ###-####. fire/life/safety failed.
BLD16-01491 BLD-Final10/6/201610/7/201610/7/2016 2:48:52 PMPPASS
Please call ahead for access - Alan Phone #: ###-####. Ok for perm occ.
BLD16-01286 BLD-Final10/6/201610/7/201610/7/2016 2:47:10 PMPPASS
Please call ahead for access - Alan Phone #: ###-####
BLD16-02369 BLD-Final10/7/201610/7/201610/7/2016 2:47:10 PMPNR
Bob Phone #: ###-####. Needs plumbing final..
provide blower door test and co detector outside bedrooms.
BLD16-01286 DOC - Permit Finaled10/7/201610/7/201610/7/2016 2:46:59 PMPPASS
BLD16-03640 BLD-Final10/7/201610/7/201610/7/2016 1:40:09 PMPDONE
Phone #: ###-#### Inspection requested via web by Ira Rutledge
BLD16-03640 DOC - Permit Finaled10/7/201610/7/201610/7/2016 1:39:57 PMPPASS
All work appeaed to be done in accordance with local codes and ordinances.
BLD16-00241 BLD-Final10/6/201610/7/201610/7/2016 12:25:25 PMAPASS
Need to call Terry for Access @ ###-####. There are 38 individual apartments to potentially coordinate with. Phone #: ###-#### Inspection requested via web by Ryan Steinwand
BLD16-00241 DOC - Permit Finaled10/7/201610/7/201610/7/2016 12:25:16 PMPPASS
BLD16-01092 BLD-Conference10/3/201610/7/201610/7/2016 11:27:53 AMAPART
12:30 grout. Strata onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt.. Pending special inspection.
BLD15-04063 BLD-Framing/Rough-in10/6/201610/7/201610/7/2016 10:43:53 AMAPASS
Kent// 3rd floor Phone #: ###-####
BLD15-04063 BLD-Energy code compliance10/7/201610/7/201610/7/2016 10:43:36 AMAPASS
Kent// 3rd floor Phone #: ###-####. 3rd floor east wing and central wing ok to cover. Not insulated on west wing yet.
BLD16-03687 BLD-Framing/Rough-in10/6/201610/7/201610/7/2016 9:25:47 AMAPASS
Meg Phone #: ###-####
BLD14-03070 BLD-Framing/Rough-in10/6/201610/7/201610/7/2016 8:57:53 AMAPASS
cody Phone #: ###-####. All framing issues resolved on 1st., 2nd., and 3rd. floors north half of building. Ok to insulate.
BLD16-01105 BLD-Framing/Rough-in10/6/201610/7/201610/7/2016 8:14:27 AMANR
Chad Phone #: ###-####. Plumbing and mech. rough in inspections have failed.
BLD16-00641 BLD-Final10/6/201610/7/201610/7/2016 8:11:11 AMANR
would like call ahead; Scott Phone #: ###-####. Needs fire/life/safety and sprinkler finals.