BLD98-01145
| INSP - Energy code compliance | 10/8/1998 | 10/8/1998 | 10/9/1998 12:00:00 AM | P | PASS |
|
|
ok, c/n ok
|
BLD98-01156
| INSP - Framing/Rough-in | 10/8/1998 | 10/8/1998 | 10/8/1998 12:00:00 AM | P | PASS |
|
|
jack ###-#### REC'D ADD'L LETTER FOR TRUSSES, OK TO COVER.
|
BLD98-01162
| INSP - Energy code compliance | 10/8/1998 | 10/8/1998 | 10/8/1998 12:00:00 AM | P | PASS |
|
|
c/n ok
|
BLD98-01308
| INSP - Framing/Rough-in | 10/8/1998 | 10/8/1998 | 10/8/1998 12:00:00 AM | P | NR |
|
|
conf only w/ bldr...lost both set approved plans, wants to request final...what to do? Bring own set to inspection & hope for the best.
|
BLD98-02012
| INSP - Framing/Rough-in | 10/8/1998 | 10/8/1998 | 10/8/1998 12:00:00 AM | P | NR |
|
|
CARPENTRY ONLY, SPOKE W/ FRAMER. NEED ENG'S REPORT PRIOR TO COMPLETE FRAME INSP.
|
BLD98-02332
| INSP - Framing/Rough-in | 10/8/1998 | 10/8/1998 | 10/8/1998 12:00:00 AM | P | PART |
|
|
conf w/ bldr, carpentry insp of eng'd drag strut at porch area. ok
|
MEC98-00232
| INSP - Final | 10/7/1998 | 10/8/1998 | 10/8/1998 12:00:00 AM | P | NH |
|
|
Scheduled by Hello!. Contact phone is [3899734]. gated entrance...house locked...
|
MEC98-00232
| INSP - Final | 10/7/1998 | 10/8/1998 | 10/8/1998 12:00:00 AM | P | NH |
|
|
Scheduled by Hello!. Contact phone is [3899734]. gated entrance...house locked...
|
BLD97-02259
| INSP - Framing/Rough-in | 10/8/1998 | 10/8/1998 | 10/8/1998 12:00:00 AM | P | PART |
|
|
dave ###-#### pager call before going so he can meet you 2hr wall at boiler room...fan at lid moved, replumbed, penetrations. ok
|
BLD97-02998
| INSP - Final | 10/7/1998 | 10/8/1998 | 10/8/1998 12:00:00 AM | P | PASS |
|
|
Check that driveway has been paved so we can return the bond. Owner says it's been done. Thanks! CW...DRIVEWAY IN, OK TO RELEASE BOND. CARL
|