PLM02-03026
| Plumbing Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | A | PASS |
|
|
ri ok , hub drain must extend up thru cabinet and be sealed for wh pan and t&p drain 10/8/2002 10:08:25 AM
|
PLM02-02974
| Plumbing Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 11:25:43. Contact: ###-####. install soffett and insulate piping in garage ceiling and call for reinspection. 10/8/2002 3:56:25 PM
|
PLM02-03067
| Plumbing Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | PASS |
|
|
creg ###-#### ri ok 10/8/2002 3:37:29 PM
|
PLM02-03060
| Water and/or Sewer | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | PASS |
|
|
###-#### sw final ok 10/8/2002 1:23:27 PM
|
PLM02-03012
| Plumbing Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | PASS |
|
|
reinspection on tub trap. builder is going to extend the soffet down to protect from freezing trap ri ok 10/8/2002 4:20:13 PM
|
PLM02-00906
| Storm Drains | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | PART |
|
|
rd& of west baggage area test ok 10/8/2002 2:57:26 PM
|