MEC02-02838
| Final | 10/7/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | A | FAIL |
|
|
###-#### posted corrections 10/8/2002 10:11:55 AM
|
MEC02-02775
| Final | 10/7/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | A | PASS |
|
|
###-#### ..8th..right on brumbach 10/8/2002 8:41:16 AM
|
MEC02-02775
| Pressure Test | 10/7/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | A | PASS |
|
|
|
MEC02-02862
| Rough-in | 10/7/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-02726
| Rough-in | 10/7/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/07/2002 at 18:35:36. Contact: ###-####. need btu load on furn/wh..insualte all metal in attic 10/8/2002 10:48:10 AM
|
MEC02-02726
| Pressure Test | 10/7/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/07/2002 at 18:36:34. Contact: ###-####. waiting on btu load...70' 10/8/2002 10:48:22 AM
|
MEC02-02889
| Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 04:32:18. Contact: ###-####. pull plastic and insul away from vent pipe 10/8/2002 11:13:10 AM
|
MEC02-02902
| Final | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 08:58:58. Contact: ###-####...ustick..right on wildwood 10/8/2002 12:02:59 PM you will need to call for a final 10/8/2002 2:26:22 PM
|
MEC02-02848
| Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 09:30:34. Contact: ###-####.
|
MEC02-02904
| Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 09:50:00. Contact: ###-####.pierce park..left on outlook 10/8/2002 12:05:59 PM
|
MEC02-02904
| Pressure Test | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 09:50:33. Contact: ###-####.
|
MEC02-02878
| Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | NR |
|
|
GREG ###-#### called greg 10/8/2002 2:43:57 PM
|
MEC02-02878
| Pressure Test | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | NR |
|
|
GREG
|
MEC02-02792
| Final | 10/8/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 10:50:30. Contact: ###-####. home owner removed door from laundry room to house for comb air requirements 10/8/2002 5:59:15 PM
|
MEC02-02806
| Rough-in | 10/1/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via He10/01/2002 at 16:42:04. Contact: ###-####...boise ave..left on old oak 10/8/2002 12:04:22 PM...f/p 10/8/2002 12:12:33 PM
|
MEC02-02806
| Pressure Test | 10/1/2002 | 10/8/2002 | 10/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/01/2002 at 16:42:44. Contact: ###-####.
|