Inspections for the day of: Wednesday, October 8, 2003.
Number of inspections: 28
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC03-01060 MEC-Aging Inspection10/8/200310/8/200310/8/2003 12:00:00 AM PASS
work in progress 10/8/2003 12:19:39 PM
MEC03-01234 MEC-Aging Inspection10/8/200310/8/200310/8/2003 12:00:00 AM PASS
MEC03-01310 MEC-Aging Inspection10/8/200310/8/200310/8/2003 12:00:00 AM PASS
MEC02-02138 Final10/8/200310/8/200310/8/2003 12:00:00 AMAPASS
just needs final/doc final thanks darla
MEC03-02583 Final10/7/200310/8/200310/8/2003 12:00:00 AMAPASS
separated main gas to 4 lines to each tenant 10/8/2003 9:42:37 AM
MEC03-02584 Final10/7/200310/8/200310/8/2003 12:00:00 AMAPASS
separated main gas into 4 lines to each tenant 10/8/2003 9:42:05 AM
MEC03-02600 Final10/7/200310/8/200310/8/2003 12:00:00 AMAPASS
separated main gas into 4 lines to each tenant 10/8/2003 9:42:21 AM
MEC03-02655 Rough-in10/7/200310/8/200310/8/2003 12:00:00 AMAPASS
kirk; Phone #: ###-#### Internet Inspection Request from: Darla Downs dixie , for 6513 & 6515 only... ( no pressure test needed at this time ) all rtu's and inside ductwork ok for r/i for 13-15-17..all of which are under the vanilla finish...gas not ready yet 10/8/2003 10:36:58 AM
MEC03-02808 Final10/7/200310/8/200310/8/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/7/2003 at 3:41:26 PM. new line to unit not tested 10/8/2003 12:16:57 PM
MEC03-02809 Final10/7/200310/8/200310/8/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/7/2003 at 3:43:21 PM. Contact: ###-####. new line to rtu not tested 10/8/2003 12:17:17 PM
MEC03-02795 Pressure Test10/7/200310/8/200310/8/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/7/2003 at 4:33:04 PM. Contact: ###-####...five mile..left on goldenrod..right on wisteria 10/8/2003 8:34:41 AM 20lb test ok 10/8/2003 10:02:14 AM
MEC03-02798 Final10/7/200310/8/200310/8/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/7/2003 at 9:53:30 AM...before franklin on right 10/8/2003 8:36:47 AM need make-up air...need ok from wolfe engineer on different hood used than manuf specified 10/8/2003 12:18:14 PM
MEC03-02539 Pressure Test10/7/200310/8/200310/8/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/7/2003 at 11:47:17 AM. Contact: ###-####. this should be a final...called cont 10/8/2003 8:45:51 AM
MEC03-02752 Rough-in10/7/200310/8/200310/8/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/7/2003 at 8:21:16 AM. Contact: ###-####.
MEC03-02737 Final10/7/200310/8/200310/8/2003 12:00:00 AMAPASS
ROBIN; Phone #: ###-#### Internet Inspection Request from: Annette Moore..northview..left on hartman 10/8/2003 8:37:40 AM
MEC03-02652 Final10/7/200310/8/200310/8/2003 12:00:00 AMAPASS
PLEASE INSPECT AS CLOSE TO 11:00AM AS POSSIBLE. HOPEFULLY LLOYD WILL BE READY.
THANKS
CAROL; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
MEC02-00197 Conference10/7/200310/8/200310/8/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/7/2003 at 7:08:11 PM. Contact: ###-####. extended permit.. 10/8/2003 12:46:12 PM
MEC02-03574 Final10/7/200310/8/200310/8/2003 12:00:00 AMPPASS
###-#### teresa ###-####..off overland north of curtis 10/8/2003 12:24:21 PM
MEC03-00191 Final10/7/200310/8/200310/8/2003 12:00:00 AMPFAIL
###-#### dan wrong permit called in 10/8/2003 5:49:20 PM
MEC03-01918 Final10/7/200310/8/200310/8/2003 12:00:00 AMPNH
Phone #: ###-#### Internet Inspection Request from: Veronica England called veronica...she will recall 10/8/2003 5:49:57 PM
MEC03-02710 Final10/7/200310/8/200310/8/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/7/2003 at 4:49:16 PM. Contact: ###-####...maple grove to sunflower..left on patricia 10/8/2003 12:23:05 PM
MEC03-02710 Pressure Test10/7/200310/8/200310/8/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/7/2003 at 4:49:51 PM. Contact: ###-####.
MEC03-02281 Final10/8/200310/8/200310/8/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/8/2003 at 11:04:06 AM. Contact: ###-####.
MEC03-02785 Pressure Test10/8/200310/8/200310/8/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/8/2003 at 7:41:18 AM. Contact: ###-####...collister left on hill rd..left on maplewood 10/8/2003 8:35:42 AM gas test ok...disengage damper in f/p 10/8/2003 2:03:01 PM
MEC02-03736 Final10/8/200310/8/200310/8/2003 12:00:00 AMPPASS
carleen; Phone #: ###-#### Internet Inspection Request from: Darla Downs..off fairview before cole 10/8/2003 12:30:02 PM
MEC03-02708 Final10/8/200310/8/200310/8/2003 12:00:00 AMPPASS
david; Phone #: ###-#### Internet Inspection Request from: Darla Downs gas test and final ok 10/8/2003 2:28:39 PM
MEC03-02425 Final10/8/200310/8/200310/8/2003 12:00:00 AMPPART
chad ###-#### tml final ok...waiting for gas test from lacy mech 10/8/2003 5:49:07 PM
MEC03-02795 Pressure Test10/7/200310/8/200310/7/2003 10:12:44 AMACANC
###-#### DESIGN AIR Disp set to [CANC] by a contractor via Hello! on Oct 7 2003 10:12AM.