PLM07-03380
| Groundwork | 10/8/2007 | 10/8/2007 | 10/8/2007 4:51:05 PM | P | PASS |
|
|
Carlos. Phone #: ###-#### Internet Inspection Request from: raul castanon
|
PLM07-02355
| Final | 10/8/2007 | 10/8/2007 | 10/8/2007 3:31:49 PM | P | PART |
|
|
josh Phone #: ###-#### need to provide strainer,s for all floor sink,s caulk all fixtures have all soap and chemical dispenser,s installed
|
PLM07-01562
| Plumbing Rough-in | 10/5/2007 | 10/8/2007 | 10/8/2007 2:16:30 PM | A | CANC |
|
|
Partial rough-in for med gas and plumbing. Field contact is Colin Libby. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet water on second floor east wing test ok
|
PLM07-03274
| Storm Drains | 10/5/2007 | 10/8/2007 | 10/8/2007 10:09:03 AM | A | PART |
|
|
dean Phone #: ###-#### six inch trunk lines test ok still need to connect roof drain,s from building and test
|
PLM07-02455
| PLM-Aging Inspection | 10/8/2007 | 10/8/2007 | 10/8/2007 9:27:37 AM | | PASS |
|
|
project under construction
|
PLM07-02236
| PLM-Aging Inspection | 10/8/2007 | 10/8/2007 | 10/8/2007 9:26:22 AM | | PASS |
|
|
project under construction
|
PLM07-00865
| Final | 10/5/2007 | 10/8/2007 | 10/8/2007 9:14:27 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/5/2007 at 3:42:54 PM. Contact: ###-####.
|