PLM07-02062
| Final | 10/7/2008 | 10/8/2008 | 10/9/2008 8:51:25 AM | P | DEFR |
|
|
|
PLM05-04063
| Plumbing Rough-in | 10/8/2008 | 10/8/2008 | 10/9/2008 8:50:23 AM | P | NR |
|
|
val Phone #: ###-#### went over some waste and venting and some water sizing.
|
PLM08-02113
| Final | 10/8/2008 | 10/8/2008 | 10/9/2008 8:37:46 AM | P | NH |
|
|
marisa - after 2:30 please Phone #: ###-####
|
PLM08-02364
| Groundwork | 10/7/2008 | 10/8/2008 | 10/8/2008 3:43:43 PM | P | PART |
|
|
carlos produce hub drains ok
|
MEC08-01342
| Pressure Test | 10/7/2008 | 10/8/2008 | 10/8/2008 2:45:55 PM | A | PASS |
|
|
meet dixie to check hydronic piping snow melt system ok
|
PLM08-02367
| Water and/or Sewer | 10/8/2008 | 10/8/2008 | 10/8/2008 2:45:23 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Leanne Ruzicka ri ok
|
ESC07-00913
| Random Inspection | 10/8/2008 | 10/8/2008 | 10/8/2008 9:53:38 AM | A | PASS |
|
|
looks good
|
PLM08-02372
| Water and/or Sewer | 10/7/2008 | 10/8/2008 | 10/7/2008 1:25:16 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom partial sewer replacement ok 3' outside the house to driveway
|