FIR08-00612
| INSP-Sprinkler Rough-in/Hydro | 10/7/2008 | 10/8/2008 | 10/8/2008 4:37:48 PM | P | FAIL |
|
|
Lacking coverage at both the north and south stairway landings 1st floor, seismic bracing at two locations is not approved including at the riser and the 3rd floor. See locations marked on plans.
|
FIR08-00437
| FIR-Aging Inspection | 10/8/2008 | 10/8/2008 | 10/8/2008 4:34:01 PM | | DONE |
|
|
Work in progress, construction underway.
|
FIR08-00279
| INSP-Conference | 10/7/2008 | 10/8/2008 | 10/8/2008 4:32:16 PM | P | DONE |
|
|
Conference regarding attatched outside storage area. See NFPA 13 2007 8.15.7.5 regarding coverage at areas below exterior canopies.
|
FIR08-00650
| INSP-Final Inspection | 10/7/2008 | 10/8/2008 | 10/8/2008 4:29:34 PM | A | PASS |
|
|
Interconnections at the clean agent system to the fire alarm control panel including off site monitoring verified, permit finaled.
|
FIR07-01018
| INSP-Final Inspection | 10/7/2008 | 10/8/2008 | 10/8/2008 4:27:26 PM | A | PASS |
|
|
Items on C/N finished, forward flow testing passed, outside bell adjusted while on site, overhead fire sprinkler permit finaled.
|
FIR08-00364
| INSP-Final Inspection | 10/6/2008 | 10/8/2008 | 10/8/2008 4:25:14 PM | A | PART |
|
|
Permit cannot be finaled at this time due to non-functional HVAC units. FACP, batteries, phone lines, and sprinkler monitoring tested okay, one flow switch adjusted while on site, signals verified.
|
FIR06-00621
| INSP-Alarm Testing | 10/3/2008 | 10/8/2008 | 10/8/2008 4:22:30 PM | A | PART |
|
|
Tested remainder of heat detection devices in building 2 at the non-clean common corridors and mechanical areas.
|
FIR08-00279
| INSP-Conference | 10/7/2008 | 10/8/2008 | 10/7/2008 2:59:28 PM | P | CANC |
|
|
Mike Bierman is the contact. Thanks. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|