PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, October 8, 2012
.
Number of inspections:
10
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Kimberly M. Johnson
Title
EROSION CONTROL
Phone #
208-794-3958
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC11-00059
General Inspection
10/8/2012
10/8/2012
10/9/2012 1:30:47 PM
PASS
ESC10-00778
General Inspection
10/8/2012
10/8/2012
10/9/2012 11:39:54 AM
PART
Some washout on ground. Perimeter control in NE side installed and in good condition
ESC12-00361
Site Preparation
10/8/2012
10/8/2012
10/8/2012 3:40:12 PM
PASS
ESC12-00320
General Inspection
10/8/2012
10/8/2012
10/8/2012 3:24:02 PM
PASS
ESC12-00126
General Inspection
10/8/2012
10/8/2012
10/8/2012 3:12:08 PM
FAIL
Perimeter control needs corrected or final landscaping completed
ESC12-00690
Complaint Inspection
10/8/2012
10/8/2012
10/8/2012 2:06:51 PM
P
PASS
Responded to dust complaint. No active construction occurring at time of inspection. Soil conditions dry and powdery, prone to dust. Discussed complaint with RP and preventative measures available. Will require improved construction entrance if complaints continue.
ESC11-00415
General Inspection
10/8/2012
10/8/2012
10/8/2012 11:51:53 AM
PASS
Landscape seeded and mulched. No vegetation yet.
ESC11-00117
General Inspection
10/8/2012
10/8/2012
10/8/2012 11:34:59 AM
PASS
ESC12-00032
General Inspection
10/8/2012
10/8/2012
10/8/2012 11:27:23 AM
FAIL
Construction refuse oveflowing, gutter needs swept, rills forming on slope in back. Part of backyard has been stabilized with sod. Slope track walked horizontally. Met with RP onsite. Slope stabilization scheduled for Friday, 10/12. Refuse called in to be hauled out this week. Crew onsite today will sweep gutter today.
ESC12-00898
Complaint Inspection
10/8/2012
10/8/2012
10/8/2012 12:00:00 AM
A
PART
Complaint construction debri is entering unprotected inlet. Site visit found perimeter controls in place and one drain inlet installed. The adjacent drop inlet was not protected. No evidence of pollutants entering storm drain at the time of inspection. Called RP to request inlet protection in both drains. Will be complete by end of day 10/9