ESC12-00290
| Aging Inspection | 10/1/2013 | 10/1/2013 | | | |
|
|
|
GCB13-00070
| GCB-Framing | 10/8/2013 | 10/8/2013 | 10/8/2013 4:33:55 PM | P | PASS |
|
|
Jerremy ###-#### Need inspection as soon as possible
|
BLD13-02278
| BLD-Footing | 10/7/2013 | 10/8/2013 | 10/8/2013 4:28:49 PM | A | PASS |
|
|
Curt Phone #: ###-####
|
GCB13-00065
| GCB-Final | 10/8/2013 | 10/8/2013 | 10/8/2013 3:59:54 PM | P | PASS |
|
|
Mike ###-#### Unable to determine if all other agencies have finaled. Structural final only...OK
|
GCB13-00071
| GCB-Framing | 10/8/2013 | 10/8/2013 | 10/8/2013 3:55:41 PM | P | PASS |
|
|
Jerremy ###-#### Need inspection as soon as possible
|
MIS13-00285
| BLD-Conference | 10/7/2013 | 10/8/2013 | 10/8/2013 3:35:33 PM | P | DONE |
|
|
Complaint of remodeling with out permits. Interior remodel, demo, wiring, windows, patio slab (footings!) Stop Work Issued. posted on window.
|
BLD13-00042
| BLD-Foundation | 10/7/2013 | 10/8/2013 | 10/8/2013 11:56:13 AM | A | PART |
|
|
Josh Phone #: ###-#### OK to pour retaining wall located furthest East. Engineer Brian Sielaff OK'd # 5 horiz. in lieu of # 6 as shown on plan. Stamped letter verified. Called Mike J. He gave me a verbal that rebar in footing was OK'd by him.........He was waiting for approval of subgrade from Geotech.
|
BLD13-01853
| BLD-Framing/Rough-in | 10/8/2013 | 10/8/2013 | 10/8/2013 10:35:53 AM | P | CANC |
|
|
micah Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
|