BLD13-01269
| FIRE-Final Inspection | 10/8/2013 | 10/8/2013 | 10/9/2013 11:08:50 AM | P | PART |
|
|
Fire life safety final pending project related fire sprinkler permit work.
|
FIR13-00170
| INSP-Alarm Testing | 10/8/2013 | 10/8/2013 | 10/9/2013 8:51:59 AM | P | FAIL |
|
|
Correction items incomplete at the time of requested inspection.
|
FIR13-00305
| INSP-Final Inspection | 10/8/2013 | 10/8/2013 | 10/8/2013 3:57:01 PM | P | PASS |
|
|
C/N items field verified for completion. CPVC piping at the basement level now meets mfg. guidelines for exposed installation. Fire sprinkler permit finaled.
|
BLD13-01452
| FIRE-Final Inspection | 10/8/2013 | 10/8/2013 | 10/8/2013 1:25:21 PM | P | PASS |
|
|
Fire life safety final approved.
|
FIR13-00170
| INSP-Alarm Testing | 10/8/2013 | 10/8/2013 | 10/8/2013 1:22:04 PM | A | PART |
|
|
|
BLD13-01452
| FIRE-Final Inspection | 10/8/2013 | 10/8/2013 | 10/8/2013 1:21:12 PM | A | PASS |
|
|
Fire life safety finaled.
|
FIR13-00546
| INSP-Final Inspection | 10/7/2013 | 10/8/2013 | 10/8/2013 7:43:47 AM | A | PASS |
|
|
Permit finaled
|